My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chisholm Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Chisholm Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:30:13 AM
Creation date
8/18/2014 4:56:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
El <br />Cite of Miami <br />�w <br />Johnny Martinez, P.E. <br />i <br />City Manager <br />To Whom it May Concern <br />Subject: Reference Letter for Consultant <br />Name of Proposer: <br />The above referenced Consultant is submitting on a Request for Qualifications that has been <br />issued by the City of Miami. We require that the Proposer provide written references with their <br />submission and by providing you with this document the Consultant is requesting that you <br />provide the following reference information. We would appreciate you providing the information <br />requested below as well as any other information your feel is pertinent: <br />Name of Project: Shenandoah Park Improvements <br />Scope of work: Childcare Facility design, Recreation Bldg renovation, Pool House ADA upgrades, Site work <br />Value of project: $ 1'829,913 Value of Design Services: $199.310 <br />Delivery method: g Design- Bid -Build ❑ CM @Risk ❑ Design -Build ❑ Other ( ) <br />Design completed on time & within budget: ❑ Yes No Date completed: <br />1/28/2009 <br />If no, was the Consultant at fault or contribute to the delay(s) or increased cost? ❑ Yes g] No <br />Quality of Design: Above expectations ❑ Average ❑ Below Expectations <br />Errors & Omissions: ❑ Above expectations 0 Average ❑ Below Expectations <br />(Above expectations means there were fewer errors 8 omissions than anticipated) <br />Did Errors & Omissions result in increased construction cost? ❑ Yes Q No <br />Did Consultant provide Construction Administration services? Q Yes ❑ No ❑ limited scope <br />Was the Consultant responsive to the Owner & Contractor ?: 9 Yes ❑ No <br />Comments: <br />Name of individual completing this form: Andre Bryan Date: 4/112013 <br />Signature: / Title: Electrical Engineer <br />Telephone: (305) 416 -1211 E-mail: abryan @miamigov.com <br />Sincerely, <br />® Jeovanny Rodriguez, P.E. <br />Assistant Director <br />RFa -PP -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.