My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chisholm Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Chisholm Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:30:13 AM
Creation date
8/18/2014 4:56:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />City of Boca Raton Downtown Parking Study <br />Mr. Plummer managed the technical efforts for a comprehensive parking study for <br />Downtown Boca Raton to reanalyze the adopted parking requirements and investigate new <br />strategies to meet short-term and long -term parking needs. The basic work tasks included <br />a detailed parking inventory, projecting parking demand, and recommending parking <br />strategies to meet future demand. <br />American Airlines Arena Transportation Management Plan & Parking Study <br />Mr. Plummer was responsible for providing a comprehensive traffic and parking <br />management plan for the American Airlines Arena in downtown Miami, FL. This effort <br />included developing temporary street modifications, police control plans, fire - rescue <br />access, bus /taxi /limo staging plans, surface street signs, expressway directional signs, and <br />parking plans. This multi - jurisdictional effort led to one of the fastest parking garage <br />unloading times for a National Basketball Association arena. <br />Downtown Miami Transportation Master Plan <br />Mr. Plummer spearheaded the management and technical efforts of this complex <br />transportation master plan for downtown Miami. This plan guides future transportation <br />® improvements, solves transportation problems, improves the efficiency of the transportation <br />system, and helps to achieve the desired vision for Downtown Miami for the next 25 years. <br />u <br />OTHER SIGNIFICANT PROJECTS: <br />• Town of Celebration, FL Parking Study <br />• Marlins Ballpark Parking Study <br />• Miami -Dade County Public Works Transportation Consultant <br />• Doctors Hospital Parking Analysis <br />• Miami International Airport Trip Generation Study <br />• Miami -Dade County Integrated Transportation Management System (ITMS) <br />• Miami -Dade County Congestion Management System <br />• City of Miami Transportation Consultant <br />• City of Coral Gables Transportation Consultant <br />• Coral Gables Trolley <br />• Mercy Hospital Parking Study <br />• Boca Raton Circulator Feasibility Study <br />• MPO Congestion Management System <br />• Performing Arts Center Transportation Management Plan & Parking Study <br />• Museum Park Miami Transportation Consultant <br />z of z dPa David Plummer & Associates <br />TRANSPORTATION • CML • STRUCTURAL • ENVIRONMENTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.