|
u
<br />11
<br />MIAMI -DADE COUNTY — INTERNAL SERVICES DEPARTMENT (ISD)
<br />gas ISD FORM NO. 11
<br />EXPERIENCE & QUALIFICATION / PREFERENCE / REFERENCE FORM
<br />INSTRUCTIONS
<br />This form must be submitted by each team member (Prime, A/E Sub- consultant, and /or non -A/E sub - consultant),
<br />as applicable. Applicable firm must list previous similar type project in which it has performed work.
<br />The reference provided below should be for one project and must comply with the requirements listed in
<br />Sections 1.2, Scope of Services, Experience and Qualifications /Preferences, and 2.1, Format and Contents, of the NTPC.
<br />APPLICABILITY TO EXPERIENCE & QUALIFICATION (S) / PREFERENCE( 5
<br />This project reference complies with the Experience and Qualification(s) and /or Preference(s) required under Section 1.2,
<br />Scope of Services, of the NTPC. ® Yes OR ❑ Not Applicable
<br />If yes, please indicate which of the Experience and Qualification(s) and /or Preference(s) that is met with this project
<br />reference.
<br />Programming, Design, Multi- Purpose, Meeting - Exhibit Spaces, Church, Audio-visual, Acoustics, Planning, Large Crowd
<br />REFERENCE PROJECT INFORMATION
<br />Firm Name: R.E. Chisholm Architects, Inc.
<br />Reference Project Name /Address: Our Lady of Guadaloupe Sanctuary, Miami , FL.
<br />Name(s) and Role(s) of Consultant Personnel Working on this Reference Project: Robert E. Chisholm FAIR, NCARB,
<br />Chairman, Matthew Polak, AIA, LEED AP, President,
<br />Reference Project Description: 10,000 SF Church
<br />Scope of Services Provided: Architecture
<br />Total Compensation for Services: $ $450,000.00 Project Start Date: 04/2005 Project Completion Date: 04 /2008
<br />Project Construction Cost: $ $8,000,000.00 Construction Start Date: Construction Completion Date:
<br />01/2008 04/2008
<br />Reference Company Name: Reference Contact Name: Robert Brown
<br />Reference Telephone Number: Facsimile Number: E -mail: N/A
<br />305.762.1033 N/A
<br />SPACE BELOW IS TO BE UTILIZED TO EXPAND ON THE SCOPE OF SERVICES PROVIDED FOR THIS PROJECT REFERENCE.
<br />PLEASE DESCRIBE YOUR FIRM'S INVOLVEMENT IN THE REFERENCE PROJECT. PROVIDE DETAILS TO SUPPORT WHETHER
<br />EACH TEAM MEMBER'S PARTICULAR EXPERTISE RELEVANT TO THE PROJECT WAS GAINED UNDER CURRENT
<br />EMPLOYMENT, OR AS A MEMBER OF ANOTHER FIRM. (ADDITIONAL SHEETS OF PAPER MAY BE USED TO INCLUDE
<br />INFORMATION).
<br />The building is a total of 10,408 S.F. of enclosed area, of which the SanctuaryMulti- purpose Area is 6,519 S.F.
<br />In addition to the Sanctuary/Multi- purpose Area the building will also house 1,803 S.F. of offices, a space for a Future Kitchen and
<br />Support Area of 1,035 S.F., a 312 S.F. Sacristy, and 739 S.F. for the Men's and Women's Resttooms, a separate Handicap Toilet Area,
<br />Storage and Janitor's Closet.
<br />The building will be a one -story standard concrete block and stucco building 2 P -0" to the top of the parapet at the area which has a flat
<br />roof area. The interior block walls and the partitions though out the building will be finished in drywall.
<br />The main entrance to the office wing will have a high ceiling with a cement tile sloped roof. The top of the ridge will be just under 26 " -0"
<br />high. The Restroom Wing will also have a sloped roofed with cement the finish.
<br />The building will have a coffered drywall and acoustical ceiling in the Sanctuary/Multi- purpose Area. Whenever possible the exterior
<br />walls will have walls sconces around the perimeter of the Sanctuary/Multi- purpose so as to eliminate the need for as many recessed lights
<br />in the drywall ceiling as possible.
<br />The Phase I Plan will also include a plaza in front of the building with landscaping, a small service drive, a concrete road to the parking
<br />lot, and the parking lot
<br />
|