Laserfiche WebLink
• <br />B <br />B <br />0 <br />CES Team Qualifications <br />The CES 'ream has experience providing <br />Miscellaneous Civil Engineering and <br />Construction Services for local Florida <br />municipalities and has the expertise <br />needed to perform the projects with <br />similar approach involving infrastructure <br />improvements. The projects listed below <br />are examples of exactly that experience. <br />CES provided miscellaneous engineering <br />services for the design and construction of <br />major infrastructure improvements for the <br />City of Miramar. The improvements involved <br />planning, design and permitting for new <br />water and gravity sewer pipelines; storm <br />water drainage improvements; design of <br />a new pumping station, and the design <br />of associated roadway and sidewalk <br />improvements. In addition to design <br />support services, CES staff were responsible <br />for construction oversight to ensure that <br />all work performed by the contractor met <br />or exceeded the City', County and FDOT <br />construction guidelines. <br />CES was selected by Miami -Dade Public <br />Works Department to provide Engineering <br />Design Services and Construction <br />Management and Inspection Services <br />as part of the Department's Capital <br />Improvement Program. CES staff was <br />responsible for the design of ADA compliant <br />bus stops and sidewalks; drainage design; <br />roadway design; street lighting; bridge <br />design and inspections. CES personnel <br />have overseeing the construction of over <br />$150 million in capital improvement for <br />the Department. CES has been providing <br />professional services under this contract <br />since 2003. <br />CES has been contracted to design <br />approximately 72,000 L.F. of 6 -inch water <br />main and services for the City of Miramar, <br />including a directionally drilled 8 -inch <br />Ductile Iron Pipe section of 120 L.F. The <br />functionality of the design is for improved fire <br />protection throughout the neighborhoods, <br />which currently has 2 -inch and 4 -inch water <br />mains. CES is also tasked with locating <br />required fire hydrants to be connected to <br />existing 6 -inch and greater water mains. <br />The final product will provide residents with <br />essential fire protection, and it will also <br />increase the water Flow and provide better <br />water pressure to the residents. The project <br />is bound by: Pembroke Rd. to the Florida <br />City or Sunny Isles Beach <br />Continuing ?roressioncl Ser.ices for Engineering <br />RFa No I4 -07 -02 <br />August 12, 2014 <br />Turnpike and from University Drive to SW <br />68th Avenue. <br />As part of a Block Grant Program, the City <br />of Homestead selected CES to provide <br />Engineering Design for a new Flagship <br />Cinemas theater. CES provided civil <br />engineering design and construction <br />oversight associated with the access <br />road into the movie theater - water and <br />sewer; pumping station; parking lot; storm <br />water drainage; landscaping; striping and <br />lighting. The project had an estimated <br />construction value of over $12 million and it <br />was completed on time and under budget. <br />CES has provided Engineering Services to <br />Miami -Dade Water and Sewer Department <br />under multiple contracts, assisting the <br />Department in a variety of areas. CES <br />staff also developed Remedial Action <br />Plans to bring over 400 pump stations <br />into compliance with State of Florida <br />Department of Environmental Protection's <br />mandated operating criteria; designing a <br />new 72 -inch Raw Water Pipeline; proving <br />planning support services for a hydraulic <br />model; engineering and related services <br />for the expansion of the Hialeah Preston <br />Water Treatment Plant. CES also recently <br />completed the design of over 3 miles of <br />12 -inch pipeline design under a separate <br />contract under the Needs Assessment <br />Program. <br />CES also provided Construction Inspections <br />Services to the City of Fort Lauderdale as part <br />of the City's Waterworks 2011 Infrastructure <br />Improvement project. The project involved <br />the installation of new storm water drainage, <br />new water and sewer pipeline construction <br />and pumping stations; and overseeing the <br />reconstruction of roadways and sidewalks. <br />