My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:26:22 AM
Creation date
8/19/2014 11:26:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Citp of Miami <br />Carlos A. Migoya <br />City Manager <br />To Whom it May Concern <br />Subject: Reference Letter for Consultant <br />Name of Proposer: CES Consultants, Inc. <br />The above referenced Consultant is submitting on a Request for Qualifications that has been <br />issued by the City of Miami. We require that the Proposer provide written references with their <br />submission and by providing you with this document the Consultant is requesting that you <br />provide the following reference information. We would appreciate you providing the information <br />requested below as well as any other information your feel is pertinent: <br />Name of Project: Master Consulting Contract <br />Scope of work: Miscellaneous Project Management. Project. Contract Administration and Construction Engineering <br />�— <br />Value of project: $'0 . DOO Value of Design Services: <br />Delivery method: ❑ Design -Bid -Build ❑ CM@Risk ❑ Deign -Build Other ( G E i ) <br />Design completed on time & within budget: ❑ Yes ❑ No <br />If no, was the Consultant at fault or contribute to the delay(s) or increased cost? 1❑ Yes ❑ No <br />Quality of Design: ❑ Above expectations ❑ Average ❑ Below Expectations <br />Errors & Omissions: ❑ Above expectations ❑ Average ❑ Below Expectations <br />(Above e)pectations means there were fewer errors & omissions than anticipated) <br />Did Errors & Omissions result in increased construction cost? El Yes ❑ No <br />Did Consultant provide Construction Administration services? 9J Yes ❑ No ❑ limited scope <br />Was the Consultant responsive to the Owner & Contractor ?: 9 Yes ❑ No <br />Was Consultant timely in its reviews and submittals? 9 Yes ❑ No <br />Comments: <br />See- <br />Name of individual completing this forth: 1 lz_ Avlo IMi9OU. J Datte: i ::2�_ O <br />Signature: Title:`�+t"�f <br />Telephone: 305 - 375 -2116 E -mail: ocm@miamidade.gov <br />Sincerely. <br />Gary Fabrikant <br />Assistant Director <br />Conan Sunny Isles Beach $9 <br />Continuing ?rofessioncl S 2rviCes for =ngine =ring <br />3FQ No. I4-07 -02 <br />August 12.201e cnvintrz.�K <br />
The URL can be used to link to this page
Your browser does not support the video tag.