My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:26:22 AM
Creation date
8/19/2014 11:26:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Owner Agency <br />Broward County Aviation <br />Department <br />Primary Client <br />RS &H <br />3125 west Commercial <br />Blvd., Suite 130 <br />Fort Lauderdale, FL 33309 <br />htto:7 /rsandh.com <br />Primary Client Contact <br />Michael Moore, P.E. <br />P: (954( 236 -7377 <br />F: (954) 474 -3006 <br />E: mmoore@rsandh.com <br />Project Start Date <br />2009 <br />Project End Date <br />2011 <br />Construction Start Date <br />2006 <br />Construction End Date <br />2014 <br />Construction Cost <br />$1,500,000 <br />Professional Fees <br />$129,000 <br />Work Types <br />✓ Aviation <br />• Design <br />• Energy <br />• Utilities <br />• water & Sewer <br />CES is providing engineering support services to Broward County <br />Aviation Department (BCAD) to develop an accurate Existing Utility <br />Atlas for all of Ft. Lauderdale - Hollywood International Airport. <br />This project involves researching <br />available As -Built information of <br />all projects since 1997, gathering <br />new information through soft <br />digs and ground penetration <br />radar, preparing and upgrading <br />sets of plans including all new <br />utilities installed or modified <br />since 1997, and ensuring that <br />there is coordination between <br />the various information sources <br />to create a final updated Utility <br />Base Map. <br />The Utility Atlas plans will be delivered in three phases: Phase I will <br />include the Utility Atlas Update for the new South Runway 9R -27L and T- <br />4 replacement area: Phase II will include the Utility Atlas Update for all <br />property circumscribed by Perimeter Road; and Phase III will include the <br />Utility Atlas Update for all property located outside Perimeter Road, <br />west of 1 -95, and in the Ravenswood Area, as well as tenant properties <br />located North and West of the Airport. <br />CES is currently researching information and updating the Utility Atlas for <br />Phase I of this project, and has been tasked with all the Drainage and <br />Water & Sewer utilities existing within this work area. Research also <br />includes utility projects related to the Rental Car Center (RCC) and the <br />coordination of previous As -Built information. <br />City or Sunny fez Beach 9 <br />Continuing rro fessionol Services, "cr cngineenng <br />.R: Q No. 14 -07 -02 <br />Augus7 12, 2014 011�Lti s.rs. -:.c: <br />
The URL can be used to link to this page
Your browser does not support the video tag.