My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CPH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:32:02 AM
Creation date
8/19/2014 11:48:21 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TGK BOOKING CENTER - STUDY, <br />DESIGN, AND CONSTRUCTION <br />Specialized Experience & Technical Competence <br />Civil Engineering <br />✓ <br />Architectural Design <br />Road and Parking Design <br />✓ <br />✓ <br />Survevittg <br />✓ <br />CADD and/or <br />Estimation <br />Cost E <br />✓ <br />Permitting <br />✓ <br />me rvuamr -uaae k-orrecuons ano Kena Dnmatlons <br />Department requested that CPH perform a design <br />study for them to create a centralized booking area <br />in their existing Turner Guilford Knight Correctional <br />Center. In order to establish a centralized booking <br />area, separate entrances for law enforcement <br />officers (LEOs) and inmates had to be created. CPH <br />provided a conceptual plan that converted an <br />existing covered parking garage into a secured bus <br />drop -off area for the inmates. CPH was also able to create a concept plan for a Sally Port and secured parking <br />area for the LEOs. Both required new entrances to be installed on existing walls. After completing the design <br />CPH provided a conceptual plan that converted an existing covered parking garage into a secured bus drop-off <br />area for the inmates. CPH was also able to create a concept plan for a Sally Port and secured parking area for the <br />LEOs. study, the Corrections Department decided to select CPH to prepare construction documents for the <br />project as well. In order to complete this phase, CPH provided civil, architectural, and surveying services. The <br />final design chosen by the Corrections Department was derived from the initial study CPH previously performed. <br />The construction documents included plans for demolition, grading, site dimensioning, structural and electrical <br />work. All plans were prepared in accordance with the Miami -Dade County Code of Ordinances. <br />Client Contact: Ms. Alice K. Arguelles, Construction Manager 3, Miami Dade Corrections and Rehabilitation <br />Department, 3595 NW 72nd Avenue, Miami, FL 33122, Phone: 786.263.6406, Cell: 305.753.7089, Fax: <br />786.263.6448, E -Mail: APEREZ @miamidade.gov <br />13 CPH, Inc. /RFQ No. 14 -07 -02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.