My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CPH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:32:02 AM
Creation date
8/19/2014 11:48:21 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jason L. JameSlProjectEngineer <br />Leer. He is responsible for design and engineering infrastructure, <br />'I as the preparation and processing of permits through various <br />Public Works and Waste Management 58th Street Master Plan <br />• Master plan conceptual design for a 42+ acres portion <br />of the existing Public Works and Waste Management <br />site <br />• CPH provided space programming, concept design, and <br />master planning of public works /waste services <br />complex. <br />• The project included reconfiguration of site, moving <br />existing buildings, and has components such as <br />administration offices, fuel and hazard waste storage, <br />materials storage, vehicle storage, and vehicle <br />maintenance facilities. <br />Jackson Memorial Hospital Renovations Study <br />• Professional services provided included surveying, civil <br />engineering, architecture, arborist and landscape <br />architecture. <br />• The scope of work included the preparation of drawings <br />for: building demolition, gate house design, entry wall <br />and fence detailing, streetscape paving detailing, <br />grading and drainage, sediment and erosion control, <br />landscaping, irrigation and donor wall and pergola <br />design detailing. <br />• One of the primary design intents is to transform a <br />driveway entrance road into a pedestrian plaza that <br />seamlessly flows with the existing Alamo Plaza. <br />Islamorada, Village of Islands: Wastewater Collection and <br />Transmission DBO Project, Windley Key and Upper Matecumbe <br />Key Collection Systems. <br />• Low Pressure Force Main to include: 210 Service <br />Connections, 37,600 LF 1 Y." to 6" Force Main <br />• Vacuum Sewer Collection System to include: 215 <br />Collection Pits, 550 Service Connections, 3,000 LF of 3" <br />Vacuum Main, 23,000 LF of 4" Vacuum Main, 15,000 LF <br />of 6" Vacuum Main, 5,000 LF of 8" Vacuum Main, and <br />3,000 LF of 10" Vacuum Main <br />• Directionally Drilled service connections and mains that <br />cross US1 <br />TGK Booking Center - Study, Design, and Construction <br />• CPH provided a conceptual plan that converted an <br />existing covered parking garage into a secured bus <br />drop -off area for the inmates. <br />• CPH was also able to create a concept plan for a Sally <br />Port and secured parking area for the LEDs. <br />• After completing the design CPH provided a conceptual <br />plan that converted an existing covered parking garage <br />into a secured bus drop -off area for the inmates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.