My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CPH
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CPH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:32:02 AM
Creation date
8/19/2014 11:48:21 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rivera v. CPH, et.al. B&A File No. 287 -023 (WAL -MART) Case No. 10CA3325AN <br />Origination Date- May 2010 Settlement Date -June 2011 <br />CPH was sued by Sasha D. Rivera for defects in the design of a parking lot and intersection at a Wal -Mart store <br />located in Osceola County. The plaintiff alleges that a stop sign obstructed by a tree was the cause of a car <br />accident in which her mother was a passenger and who died due to injuries sustained in the accident. The driver <br />of the vehicle was convicted of vehicular homicide due to the fact that she was operating the vehicle while <br />intoxicated and under the influence from snorting computer aerosol spray. The design of the parking lot is not <br />the proximate cause of the accident; therefore, CPH had no liability. This case was settled for $10,000 to avoid <br />the cost of litigation. <br />Gary Wain and Barbara Wain v. CPH Engineers, Inc., et al <br />Origination Date- August 2005 Settlement Date- December 2010 <br />CPH received notification of a claim concerning a drainage issue at 1059 Henley Downs Place, Heathrow, FL. The <br />property owner complained about water standing on the property during the unprecedented hurricane season <br />in Florida in 2004 which resulted in record rainfall. CPH denied the claimant's allegations but CPH made a <br />business decision to resolve the matter and reduce the legal fees by agreeing to a settlement whereby the <br />developer and CPH are sharing in the cost of constructing a drain line along the easements, plus additional <br />landscaping. CPH's share was $60,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.