HUMBERTO SOTERAS
<br />expansion joint devices and replacing with a type 2 Polymer, and applying epoxy overlay on the entire roadway deck of all
<br />® ten bridges, and the recoating of the structural steel of a bascule bridge over the Intracoastal.
<br />Project Started: November 2009 Project Completed: January 2011
<br />SR-834/Sample Road, Rock Island to SR-441 - FDOT District 4
<br />Reference: FDOT PM — Mr. Javier Bejarano P.E. (954) 931 -6179
<br />Role: Contract Support Specialist/Senior Inspector — He provided the department with an excellent service and multi-
<br />tasking skills by performing a dual role in this project. He performed as the CSS for this project, responsible for the accuracy
<br />and compliance with FDOT, of all project documentation, performed all scanning of documents into the FDOT's EDMS data
<br />base and generated monthly estimates. He was the Senior Inspector on this project, responsible for monitoring and
<br />documenting the Contractor's daily activities for this Hybrid project which included: widening, milling and resurfacing, access
<br />management improvements, replacement and upgrading of existing signing and pavement markings.
<br />Project Started: January 2009 Project Completed: December 2009
<br />SR- 5/US -1 SE 301^ Street to SR-84 - FDOT District 4
<br />Reference: FDOT PM — Mr. James Jeffers, P.E. (954) 958 -7628
<br />Role: Senior Inspector — He was responsible for monitoring and documenting all construction activities, including roadway
<br />widening, milling & resurfacing, drainage, lighting, signalization, and landscaping for this centrally located project along the
<br />US-1 corridor between the Fort Lauderdale Airport and the entrance to the port, which involved heavy public involvement
<br />and utility coordination efforts.
<br />Project Started: May 2008 Project Completed: January 2009
<br />Broward Operations General Assign Contract, Broward County, FL - FDOT District 4
<br />Reference: FDOT Project Engineer, Felix Garcia, P.E. 954- 776A300
<br />Role: Senior Inspector - Assigned to an FDOT in -house signalization project on SR 818 /Griffin Rd. His responsibilities
<br />included monitoring, documenting and reporting all project activities, provided support for the FDOT Project administrator
<br />with processing monthly and final estimates, scanned all documents into EDMS, and assisted in processing final material
<br />certification for this in house project. Company: The Coradino Group:
<br />Project Started: Jan. 2008 Project Completed: May 2008
<br />® SR-821 HEFT Projects, Miami -Dade County, FL - Florida Turnpike Authority
<br />Role: Senior Project Inspector responsible for monitoring and documenting the Contractors' daily operations, to include
<br />construction and installation of drainage systems, MSE Walls construction, pile driving operations, roadway embankment,
<br />subgrade and base inspections, asphalt paving, etc. Responsibilities also included the coordination and monitoring of the
<br />Contractor's Maintenance of Traffic, Environmental and storm water pollution Controls, the materials Q.C. program and
<br />Technicians, inducting all material and sample entries into LIMS and coordination with Verification and Turnpike's an
<br />FDOTs material Labs., etc.
<br />Project Started: Jun 2006 Project Completed: Dec 2007
<br />Construction, North Dade Residency FDOT District 6:
<br />Reference: Isa Nunez, RE 305499 -2381
<br />Role: Sr. Project Inspector - Responsible for monitoring and documenting the Contractors' daily operations on various
<br />Projects, to include construction and installation of Signal & Lighting components, Concrete Placement, asphalt paving, etc.
<br />Responsibilities also included the coordination and monitoring of the Contractor's Maintenance of Traffic, Environmental
<br />and stone water pollution Controls, Q.C. and Verification Programs.
<br />Project Started: Jan 2006 Project Completed: Jun 2007
<br />Construction, SR -934 Hialeah Expressway Reconstruction Project, FDOT District 6:
<br />Reference: Roland Rodriguez 305 -499 -2370
<br />Role: Sr. Project Inspector- Responsibilities included monitoring and documenting the Contractors' daily operations, to
<br />include construction and installation of drainage systems, MSE Walls construction, pile driving operations, roadway
<br />embankment, subgrade and base inspections, asphalt paving, etc. Responsibilities also inducted the coordination and
<br />monitoring of the Contractor's Maintenance of Traffic, Environmental and storm water pollution Controls, the materials Q.C.
<br />program and Technicians, an FDOT's Verification Materials Model program and respective technicians, including
<br />scheduling and coordination
<br />Project Started: Nov. 2003 Project Completed: Dec 2005
<br />D
<br />DE
<br />J.Behar
<br />RFQ No. 14 -07 -02 1 Page 13.56