Laserfiche WebLink
PROJECT NAME: N.E. 62ND STREET IMPROVEMENTS <br />PROJECT ENTITY: Broward County <br />Engineering Division <br />1 North University Drive, Suite 300B <br />Plantation, FL 33324 <br />CONTACT NAME /NO.: Henry Cook, Director of Engineering <br />(954) 577 -4567 <br />PROJECT DESCRIPTION: The area between NW 9th Avenue to N.E. 18th <br />Avenue was an existing two lane roadway. <br />Craig A. Smith & Associates was the prime <br />consultant responsible for Engineering de- <br />sign, surveying and construction observation <br />for a three and four lane roadway. <br />RESPONSIBILITIES: Survey, Engineering (Design), Construction <br />observation. <br />ORIGINAL CONTRACT: $3,600,000.00 <br />FINAL CONTRACT: $3,600,000.00 <br />Craig A. Smith & Associates, Inc. <br />RFQ No. 14 -07 -02 <br />Page 24 <br />