Laserfiche WebLink
THE TOWN OF GOLDEN BEACH <br />DESIGN PLAN EXCERPT <br />MASTER PLAN EXERPT <br />PROJECT NAME: <br />STORMWATER MASTER PLAN UPDATE <br />PROJECT ENTITY: <br />Town of Golden Beach <br />One Golden Beach Drive <br />Golden Beach, Florida 33160 -2296 <br />CONTACT NAME/NO: <br />Alexander Diaz, Town Manager <br />(305) 932 -0744 <br />PROJECT DESCRIPTION: <br />The intent of the project was to utilize and enhance an existing master <br />plan. The updated master plan incorporated existing stormwater facilities <br />with a conceptual design in order to achieve a comprehensive system <br />that would improve the Town's Flood protection. Due to the existing con- <br />ditions within the Town (i.e., tidal influences and low topography) storm - <br />water pumps stations and water quality structures were implemented in <br />order to address the water quantity and quality of runoff prior to dis- <br />charge. <br />PROJECT INITIATION: <br />FALL 2001 <br />PROJECT COMPLETION: <br />SPRING 2003 <br />Craig A. Smith & Associates, Inc. <br />RFQ No. 14 -07 -02 <br />Page 29 <br />