Laserfiche WebLink
e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />O <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />e <br />Port Everglades Container Yard at Terminal 16: <br />Project included demolition of 90,000 SF warehouse, <br />removal of various utilities and earthwork required to <br />convert area to over 6.00 acres of cargo container yard. <br />The scope included new exfiltration trench, paving, grading <br />and drainage plans, water main relocation and fencing <br />plans. Also responsible for permitting and processing with <br />City of Hollywood and Broward County. <br />F Y + <br />77-M! <br />Port Everglades Terminal 29: Construction Management and Administration services for <br />the expansion /renovation of this terminal. <br />Port Everglades South Port Container Yard: Construction Management and <br />Administration services for the expansion of South Port Container Yard at Port Everglades. <br />The scope included site visit and observation, weekly coordination meeting attendance, daily <br />reports for site work. <br />Port Everglades Terminal 18 Phase I: Construction Management and Administration <br />services for the expansion /renovation for Phase I for Terminal 18. Responsibilities included <br />coordination for shop drawing submittals, processing Request for Information, pay requests, <br />and weekly construction meeting minutes. <br />Port Everglades Berth 33: Construction Management and Administration services for the <br />expansion /renovation of the toewall at Slip 3 and new seawall at Berth 33. <br />FPL Vault at Terminal 18: design of paving and grading for the relocation of an FPL vault. <br />Current Port Everglades Project under Construction: <br />Port Everglades Terminal 4: Site work required for conversion of container yard to 172 <br />spaces surface parking lot, passenger and bus drop off areas. The scope included paving, <br />grading and drainage plans, water main extension for new hydrant and replacement of existing <br />sewer lateral. It also included permitting and coordination with Florida Department of <br />Environmental Protection (FDEP) and Broward County for four (4) Class IV storm water <br />drainage wells <br />Seaport Relevant Project Experience: <br />Port of Miami: Prepared Design calculations and construction documents for new pump <br />station to serve existing Cargo building at the Miami Seaport, responsible for permitting and <br />coordinating with other projects in the 2020 master plan. <br />Cordova Rodriguez & Assoc., Inc. <br />RFQ# 14 -07 -02 <br />Cordova Rodriguez & Associales. Inc. <br />17 <br />