Laserfiche WebLink
�� rra <br />r -\ ,� -- SOUTH FLORIDA <br />ocorca!NxnT cNCW NO MTE k TcsnNO Mxrt 5Hry <br />RELEVANT EXPERIENCE <br />Aventura Arts and Cultural Center, <br />Aventura, Florida <br />Performed a geotechnical engineering study <br />for the 2 -story Aventura Arts and Cultural <br />Center (14,864SF). The purpose of this study <br />was to explore the subsurface conditions at <br />the site to enable an evaluation of acceptable <br />foundation systems for the proposed <br />construction. Field work included the drilling <br />of four (4) Standard Penetration Test (SPT) <br />borings to a depth of 30 feet below the <br />surface and one SPT boring to a depth of 50 <br />ft. below the surface. Confirmed that the site <br />is suitable for the planned construction when <br />viewed from a soil mechanics and foundation <br />engineering perspective. Provided a <br />geotechnical engineering report detailing subsurface and groundwater conditions at the site. Provided foundation <br />recommendations for both shallow and deep foundation alternatives so that depending on the structural loads, a comparative <br />analysis could be made and the most cost - effective foundation could be utilized. Also provided construction materials testing <br />and inspection services which included concrete and soil testing as well as fireproofing and roofing inspections. The project <br />was completed on time and within budget in 2010. <br />Client: PGAL; Contact Person: Mr. Toby Bolint, AIA (561) 988 -4002 <br />Design -Build Rehabilitation of West Bridge and Bear Cut <br />Bridge on Rickenbacker Causeway, Miami -Dade County, <br />Florida <br />Performed geotechnical engineering study for the bridge <br />widening. The project included constructing French <br />drains on the east and west sides of the bridge. Field <br />work completed included 44 Standard Penetration Test <br />(SPT) borings, 6 BoreHole Permeability (BHP) tests, and <br />rock corings. Performed pile capacity analysis and <br />prepared soil parameters and providing geotechnical <br />engineering recommendations. Additionally performed <br />studies to determine the length and pile capacity of the <br />existing bridge (unknown foundation study). Project was <br />completed on time and within budget in 2013. <br />Client: Hardesty & Hanover, Contact Person: Mr. Timothy <br />Noles, P.E. (954) 835 -9119 <br />Cordova Rodriguez 8 Assoc., Inc. RFQ# 1407 -02 29 <br />