My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cordova Rodriguez & Assoc., Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Cordova Rodriguez & Assoc., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:31:14 AM
Creation date
8/22/2014 4:21:19 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
College Parkway / Kenwood Parkway Intersection, Lee County - Project manager for the design of the intersection safety <br />improvements. <br />FPID #416231- 1 -58 -0 1: NW Eucalyptus Sidewalks, Hendry County - Team member for the design of I -% miles of <br />sidewalks which was successfully constructed in 2010. <br />FPID #4125651-1-58-0 1: State Road 29 / Felda Sidewalks, Hendry County - Team member for the design of two miles of <br />sidewalks which was successfully constructed and funded as part of American Recovery and Reinvestment Act of 2009. <br />FPID #426752- 1 -S8 -01: Lee Boulavard / Sunshine Boulavard Intersection Improvements, Lee County - Design team <br />member and construction liaison for intersection improvements which included the addition of dual left turn lanes. This <br />project was successfully constructed and funded as part of American Recovery and Reinvestment Art of 2009. <br />FPID #428105 -1 -58-0 1: County Road 78 Phase IV and V Sidewalks, Hendry County - Design team member for two miles <br />of future LAP funded sidewalks as part of a multi- phased corridor improvement project <br />FPID #427532- 1 -58 -0 1: Six Mile Cypress Parkway, Lee County - Design team member for design of three miles of two- to <br />four -lane roadway widening and drainage and utility improvements. This project is currently under construction and funded <br />as part of American Recovery and Reinvestment Act of 2009. <br />Helms Roadway Extension, Hendry County - Team member for the design of approximately three miles of new four -lane <br />urban roadway including all associated drainage, permitting, signalization, and signing and pavement marking. This project is <br />currently underway. <br />Piper Road Improvements, Charlotte County - Team member for the design of four miles of new four -lane roadway. <br />ENGINEERING <br />Cordova Rodriguez 8 Assoc., Inc. RFQ# 1407 -02 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.