Laserfiche WebLink
College Parkway / Kenwood Parkway Intersection, Lee County - Project manager for the design of the intersection safety <br />improvements. <br />FPID #416231- 1 -58 -0 1: NW Eucalyptus Sidewalks, Hendry County - Team member for the design of I -% miles of <br />sidewalks which was successfully constructed in 2010. <br />FPID #4125651-1-58-0 1: State Road 29 / Felda Sidewalks, Hendry County - Team member for the design of two miles of <br />sidewalks which was successfully constructed and funded as part of American Recovery and Reinvestment Act of 2009. <br />FPID #426752- 1 -S8 -01: Lee Boulavard / Sunshine Boulavard Intersection Improvements, Lee County - Design team <br />member and construction liaison for intersection improvements which included the addition of dual left turn lanes. This <br />project was successfully constructed and funded as part of American Recovery and Reinvestment Art of 2009. <br />FPID #428105 -1 -58-0 1: County Road 78 Phase IV and V Sidewalks, Hendry County - Design team member for two miles <br />of future LAP funded sidewalks as part of a multi- phased corridor improvement project <br />FPID #427532- 1 -58 -0 1: Six Mile Cypress Parkway, Lee County - Design team member for design of three miles of two- to <br />four -lane roadway widening and drainage and utility improvements. This project is currently under construction and funded <br />as part of American Recovery and Reinvestment Act of 2009. <br />Helms Roadway Extension, Hendry County - Team member for the design of approximately three miles of new four -lane <br />urban roadway including all associated drainage, permitting, signalization, and signing and pavement marking. This project is <br />currently underway. <br />Piper Road Improvements, Charlotte County - Team member for the design of four miles of new four -lane roadway. <br />ENGINEERING <br />Cordova Rodriguez 8 Assoc., Inc. RFQ# 1407 -02 50 <br />