|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />Principal Architect
<br />15. FIRM NAME AND LOCATION (City and Statel
<br />Sol -ARCH. Inc.
<br />14. YEARS EXPERIENCE
<br />TOTAL b. WITH CURRENT FIRM
<br />27 5
<br />16. EDUCATION !DEGREE AND SPECIALIZA T /ON/ 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Bachelors of Architecture I State of Florida, Architecture
<br />r,.n ..rval.l . , rta,ra y, e,c.r
<br />Emergency Management Agency -EXP. 03/15/15, NCARB Certified, Port of Miami Maritime Park
<br />Award of Merit AIA & Award of Excellence SARA, Florida Design Dwors Residence, Home & Condo
<br />Sachs Residence, Gables Grand Plaza FAME Award, YWCA Day Care Center Honorable Mention
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />KidCO V & Vi Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(! / applicable)
<br />2010
<br />2012
<br />(3) BRIEF DESCRIPTION (Brie/ scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />a.
<br />Project architect for 2 daycares funded by City of Miami and Dade County. 2,500 sf and
<br />4,000 sf, respectively. Scope: design, construction drawings and administraction. Total
<br />cost approximately, $900,000.
<br />(1) TITLE AND LOCATION (City aM State)
<br />(2) YEAR COMPLETED
<br />Work Force One Reroof Hollywood, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION( / /app)/cab/el
<br />2012
<br />2012
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed with current firm
<br />Project architect for a 30,000 sf reroof with a cost of $180,000. Scope: inspections,
<br />drawings, permitting and calculations.
<br />(1) TITLE AND LOCATION (Clry and State)
<br />(2) YEAR COMPLETED
<br />Tamiami Airport Restoration, Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(/f applicable)
<br />Building 221 & 247
<br />2009
<br />2012
<br />(3) BRIEF DESCRIPTION (Brie/ scope, size, cost, etc.) AND SPECIFIC ROLE Ix I Check if project performed with current firm
<br />C.
<br />Project architect for restoration because of damage caused by Hurricane Wilma for
<br />building 221 and 247, approx. 13,000sf each. Cost of construction approximately
<br />$200,000. Scope: inspections and completing construction documents.
<br />(1) TITLE AND LOCATION (City and State)
<br />12) YEAR COMPLETED
<br />MIA Edge Beam Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION () /applicable)
<br />2012
<br />d.
<br />13) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Lx J Check if project performed with current firm
<br />Project architect for repair of Edge Beam Terminal F, G and H (1,000 If). Approximate
<br />cost was $450,000. Scope: identify problems with beam and prepare repair documents, pre
<br />bid and bidding meeting, and construction management.
<br />11) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Tamiami Airport, Two Metal Hangars Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION ( /t applicablel
<br />2013
<br />13) BRIEF DESCRIPTION (Brief scope, size, cost, e1c.1 AND SPECIFIC ROLE LxJ Check if project performed with current firm
<br />e.
<br />Project architect for two new metal hangars, 11,000 sf each. Approximate cost of
<br />construction was $1,700,000. Scope: design, construction documents and construction
<br />management.
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|