Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />Principal Architect <br />15. FIRM NAME AND LOCATION (City and Statel <br />Sol -ARCH. Inc. <br />14. YEARS EXPERIENCE <br />TOTAL b. WITH CURRENT FIRM <br />27 5 <br />16. EDUCATION !DEGREE AND SPECIALIZA T /ON/ 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Bachelors of Architecture I State of Florida, Architecture <br />r,.n ..rval.l . , rta,ra y, e,c.r <br />Emergency Management Agency -EXP. 03/15/15, NCARB Certified, Port of Miami Maritime Park <br />Award of Merit AIA & Award of Excellence SARA, Florida Design Dwors Residence, Home & Condo <br />Sachs Residence, Gables Grand Plaza FAME Award, YWCA Day Care Center Honorable Mention <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />KidCO V & Vi Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(! / applicable) <br />2010 <br />2012 <br />(3) BRIEF DESCRIPTION (Brie/ scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />a. <br />Project architect for 2 daycares funded by City of Miami and Dade County. 2,500 sf and <br />4,000 sf, respectively. Scope: design, construction drawings and administraction. Total <br />cost approximately, $900,000. <br />(1) TITLE AND LOCATION (City aM State) <br />(2) YEAR COMPLETED <br />Work Force One Reroof Hollywood, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION( / /app)/cab/el <br />2012 <br />2012 <br />b. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed with current firm <br />Project architect for a 30,000 sf reroof with a cost of $180,000. Scope: inspections, <br />drawings, permitting and calculations. <br />(1) TITLE AND LOCATION (Clry and State) <br />(2) YEAR COMPLETED <br />Tamiami Airport Restoration, Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION(/f applicable) <br />Building 221 & 247 <br />2009 <br />2012 <br />(3) BRIEF DESCRIPTION (Brie/ scope, size, cost, etc.) AND SPECIFIC ROLE Ix I Check if project performed with current firm <br />C. <br />Project architect for restoration because of damage caused by Hurricane Wilma for <br />building 221 and 247, approx. 13,000sf each. Cost of construction approximately <br />$200,000. Scope: inspections and completing construction documents. <br />(1) TITLE AND LOCATION (City and State) <br />12) YEAR COMPLETED <br />MIA Edge Beam Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION () /applicable) <br />2012 <br />d. <br />13) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Lx J Check if project performed with current firm <br />Project architect for repair of Edge Beam Terminal F, G and H (1,000 If). Approximate <br />cost was $450,000. Scope: identify problems with beam and prepare repair documents, pre <br />bid and bidding meeting, and construction management. <br />11) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Tamiami Airport, Two Metal Hangars Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION ( /t applicablel <br />2013 <br />13) BRIEF DESCRIPTION (Brief scope, size, cost, e1c.1 AND SPECIFIC ROLE LxJ Check if project performed with current firm <br />e. <br />Project architect for two new metal hangars, 11,000 sf each. Approximate cost of <br />construction was $1,700,000. Scope: design, construction documents and construction <br />management. <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />