|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 11 ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Ia. TOTAL b. WITH CURRENT FIRM
<br />Michael Figueredo Project Manager 15 1 7
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Sol -A.RCH . Inc.
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Masters of Architecture Florida Certified General Contractor
<br />Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (612004) PAGE 2
<br />(1) TITLE AND LOCATION /City and State)
<br />(2) YEAR COMPLETED
<br />Staples Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(itapp /icab /e/
<br />2007
<br />2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc./ AND SPECIFIC ROLE LXJ Check if project performed with current firm
<br />a.
<br />Project manager for new 20,300 sf retail facility, US GBC Gold rating first leed retail
<br />building in Miami Dade County. Scope: design, production of working drawings,
<br />visualization and construction administration. Project cost approximately $2,000,000.00
<br />(1) TITLE AND LOCATION (City and State)
<br />12) YEAR COMPLETED
<br />The World Island Dubai, United
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION ( /f applicable)
<br />Arab Emirates
<br />2009
<br />b.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LIJ Check if project performed with current firm
<br />Project manager for the design of multiple islands including Brunki, Arabian Nights,
<br />Heart of Europe, Paraiso, Severnaya, and UK. Scope: master planning, zoning analysis and
<br />design of mix -use facilities. (in conjuncion with Bermello, Ajamil & Partners)
<br />(1) TITLE AND LOCATION (City and State)
<br />12) YEAR COMPLETED
<br />Dr. Soler Baillo Plastic Surgery Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(U applicable]
<br />2008
<br />2009
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [2SJ Check if project performed with current firm
<br />C.
<br />Project manager for an interior design project of 3,200 sf plastic surgery office,
<br />including two surgical suites. Scope: interior design and interior finish purchasing.
<br />Project cost approximately $150,000.
<br />(1) TITLE AND LOCATION (City and State)
<br />12) YEAR COMPLETED
<br />Alltoway Chevrolet Clearwater, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION(lf applicab /e)
<br />2011
<br />2012
<br />d.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LXJ Check if project performed with current firm
<br />Project manager for image branding and renovation of existing 46,000 sf Chevrolet
<br />dealership. Scope: facility design, manufactured image compliance, working drawings and
<br />construction administration. Project cost was approx. $2,000,000.00
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Maroone Chevrolet of Miami Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (it applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Ix I Check if project performed with current firm
<br />e.
<br />Project manager for image branding and renovation of existing 46,000 sf Chevrolet
<br />dealership. Scope: facility design, manufactured image compliance, working drawings and
<br />construction administration. Project cost was approx. $5,000,000.00
<br />STANDARD FORM 330 (612004) PAGE 2
<br />
|