Laserfiche WebLink
RFQ No. 14 -07 -02 <br />APPROAC «H 8c METHODOLOGY <br />PHASE FOUR: CONSTRUCTION DOCUMENTS (CD) <br />With the design fully developed, all the required technical information, such as dimensions and <br />notes, will be added to the drawings. A Project Manual will be developed, which will include a <br />final Specification document (a detailed description of every material and product used on the <br />job) and various material lists (door schedule, window schedule, finish schedule, etc.). <br />Combined, the Construction Drawings and the Project Manual become the legal documents <br />from which a General Contractor will confirm budget and ultimately construct your building. <br />We will also prepare an Application for Building Permit at this time and submit the completed <br />set of Construction Documents to the Building Department for their comments and approval. <br />(Actual time in weeks or months will be determined upon issuance of a project.) <br />Sol -ARCH t:N- www.sol- arch.com <br />ICS.,_ •. <br />E� I -- <br />_= <br />= = =_= <br />-_- <br />(� <br />iH <br />r <br />I <br />Nis <br />nr <br />Illllll. �at•� <br />mom <br />ISBN". ^ ��AM <br />!;.� <br />Sol -ARCH t:N- www.sol- arch.com <br />