My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Keith & Schnars, P.A.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Keith & Schnars, P.A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:54:26 AM
Creation date
8/25/2014 11:51:30 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />lTIMREE: <br />0 <br />As a firm that routinely handles several Continuous <br />Consulting Engineering Services contracts, our <br />organizational structure lends itself to providing design <br />services for multiple projects of various sizes in short <br />timeframes. The K &S Team recognize that strong <br />credentials, resources and ability to respond quickly <br />and efficiently are not sufficient, in and of themselves, <br />to guarantee successful performance on this contract. <br />The contract requires a management plan designed to <br />specifically address the staffing, monitoring, planning <br />and communications problems inherent in open - <br />ended contracts. Staffing will be set forth under relevant <br />disciplines below. <br />K &S survey needs will be assisted in a subconsultant capacity <br />by F.R.Aleman & Associates, Inc. (FRA). FRA, a woman and <br />Hispanic owned consulting firm, will provide underground <br />utility locates if necessary. <br />With over 120 professionals and 42 years history, K &S <br />is ready and able to respond to the City's diverse needs. <br />Tim Hall, P.E., will be the Team Project Manager. As such, <br />he will be the City's single point of contact for project <br />needs. Upon assessing the specific needs of the project, <br />Mr. Hall will have full access to all of K &S's multi - discipline <br />professionals to ensure that your needs are met.. He will <br />see that a qualified Project Manager is assigned dependent <br />upon work orders and project needs. At all times, Mr. Hall <br />will monitoring progress and be available to address client <br />concerns. <br />The organization charts and resumes below are presented in <br />accordance with the three selection categories: Engineering, <br />Survey, and Landscape Architecture. <br />Page 15 <br />1 _ <br />I . VIII <br />F, <br />`i tity, it -� - -__ ::t• <br />.) ,y'� 1' ^,•, 3 ,,.�'� .- \4 � ♦} -arc <br />,I MO KEITH and SCHSARS. P.A. <br />FiamDkgigu)� mm <br />
The URL can be used to link to this page
Your browser does not support the video tag.