Laserfiche WebLink
Donald Spicer, P.L.S. <br />Senior P,rtoiect Sur ►vevor <br />KEITH and SCHNARS, P.A. Page 38 <br />'����' F IORIDAS gI�'IOCnI. FIIim`� <br />Mr. Spicer has more than 37 years of surveying experience as a Professional Land Surveyor <br />9 <br />in South Florida. His experience includes all phases of land surveying including topographic, <br />boundary, hydrographic, As- Built, construction layout, location /route surveys for design <br />purposes, Power Transmission, residential developments, commercial projects and <br />H <br />American Land Title Association (ALTA) surveys. He is experienced in using AutoCAD for <br />the Land Surveys, Parcel Sketches, Easements, Record Drawings. Mr. <br />kr <br />preparation of and <br />Spicer also has many years of actual field work experience in the land surveying industry. He <br />is familiar with a wide range of state -of- the -art surveying equipment. He is also experienced <br />Academic <br />in project management, field survey supervision and office survey procedures. <br />Background <br />Registered Professional <br />Relevant Experience <br />Surveyor, FL #4677 <br />Fire Training Facility at 3900 Thomas Avenue, Miami, FL: Project Surveyor for <br />Professional <br />all calculations, horizontal and vertical control, supervison of survey field crews, survey <br />Affiliations <br />drawings and client coordination for boundary and topographic survey. <br />Florida Surveying and <br />Mapping Society (FSMS) <br />Utility Undergrounding - Collins Avenue, Sunny Isles, FL: Project Surveyor for <br />all calculations, survey drawings, easement sketch and descriptions, as -built drawings, <br />Florida Surveying and <br />supervision of survey field crews, horizontal and vertical control networks for project. <br />Mapping Society (FSMS) <br />GPS Users Group <br />South Florida Water Management District Surveying Contract: Field Crew <br />National Society of <br />Supervisor responsible for supervision and coordination of all field crews, verifying <br />procedures and accuracy of all field work on several projects in Broward, Palm Beach <br />Professional Surveyors <br />and Collier Counties such as, Golden Gate Canal (Collier County), Old Pompano Canal <br />(NSPS) <br />(Broward County), Pump Station 13 at Orange Drive and SR -7 (Broward County). <br />SR -Al A, from Sheridan Streetto Hollywood Boulevard (Miscellaneous Surveying <br />Contract), Hollywood, FL: Field Crew Supervisor responsible for supervision and <br />coordination of all field crews, verifying procedures and accuracy of all field work on Project. <br />Christmas Park Boundary and Topographic Survey, Miami, FL: Field Crew <br />Supervisor responsible for supervision and coordination of all field crews, verifying procedures <br />and accuracy of all field work, calculations for boundary determination and reviewing final <br />survey drawings on project. <br />FDOT District 4 - Miscellaneous Survey Contract: Field Crew Supervisor responsible <br />for supervision and coordination of all field crews, monitoring of schedules and production, <br />verifying procedures and accuracy of all field work on several projects in Broward, Palm <br />Beach, Indian River and St. Lucie Counties. <br />Oslo Road and 1 -95 Interchange Preliminary Design Study (Miscellaneous <br />Survey Contract), Indian River County, FL: Project Surveyor Responsible for all <br />calculations, horizontal and vertical control, right -of -way determination, supervision of all <br />survey field crews for project in Indian River County. Client: FDOT District 4. <br />KEITH and SCHNARS, P.A. Page 38 <br />'����' F IORIDAS gI�'IOCnI. FIIim`� <br />