My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:53:10 AM
Creation date
8/26/2014 10:37:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iffar <br />Richard D. Pryce, P.S.M. <br />REQUEST FOR QUALIFICATIONS NO. 14-07 -02 <br />Apollo Park, City of Pompano Bach - Prepared a boundary and topographic survey for the City's Apollo Park <br />consisting of 4.37 acres, located at 240 NW 16� Avenue in Pompano Beach. The City was upgrading the park <br />by installing new surfacing, new playground equipment and shade canopies. <br />3D Laser Survey Collapsed Parking Garage Miami Dade College for Forensic Structural Engineer - Perform 3D <br />laser scans of structural columns and debris piles as they were being removed over a month long process. <br />Scans of bolt patterns and footer pads as well as plumbness of remaining walls and columns for structural <br />engineer for Insurance Company. <br />3D Laser Scanning portion of Interstate 95 Topographic Design Project - Project Manager and Technical <br />Director of 3D Laser Scan Survey of a portion of Interstate 95 for Broward County Engineering to get <br />topographic elevations across 6 lanes of highway to centerline median wall for design of temporary roadway <br />for construction traffic to offload storm drainage pipes. <br />Port Everglades Utility GIS - Create a Utility Atlas in ESRI GIS format from GPS utility locations and as -built <br />surveys for the entire jurisdictional area of Port Everglades. including water, sewer, storm sewer, electric. <br />telecommunications and fuel lines. Cost: $190.000. <br />Port Everglades Storm Water Master Plan - Create a Storm water Atlas in ESRI ArcGIS format using GPS utility <br />locations and as -built surveys on every structure within the Port. The project included running 3 -wire level <br />loops through 7 NGS benchmarks and setting 188 new benchmarks throughout the port relative to NAVD88 <br />datum. Cost: $90.000. <br />Oakland Park - Harlem McBride Project - Project Survey Manager. Right -of -way surveys covering NE 5th Ave <br />from Oakland Park Blvd to NE 38 St. and NE 34 St from NE 5� Avenue to Dixie Highway (1.5 miles) Boundary <br />and topographic elevations for the existing right -of -way for street scape designs and 3D laser scanning of <br />roadways to acquire detailed elevation data for drainage. <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53r� STREET. FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />3 1 Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.