My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Craven Thompson & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:53:10 AM
Creation date
8/26/2014 10:37:26 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Car <br />aa,eo-noseoie.®a.�.c <br />Donald Shaver <br />REQUEST FOR QUALIFICATIONS NO. 14 -07 -02 <br />South County Neighborhood Improvements Project I Broward County. Florida I Construction Manager <br />Mr. Shaver was responsible for the construction management of major sections of the South County <br />Neighborhood Improvement Project. The project consisted of twelve construction packages with a total <br />construction cost of approximately $70 million dollars. Improvements included water distribution. sanitary <br />sewer. lift stations, force main, storm water improvements and roadway construction. The project included <br />the design. permitting. bidding and construction consisting of 53 miles of roadway. 181.000 linear feet of <br />storm sewer (including exfiltration trench). 140.618 linear feet of water main. 236.226 linear feet of gravity <br />sanitary sewer. and 80 miles of sidewalk. <br />Garden Acres Neighborhood Improvements I Oakland Park. Florida I Construction Manager - Mr. Shaver <br />was responsible for Construction management for the construction of the Garden Acres Neighborhood <br />Improvements. The project consisted of water distribution system, sanitary sewer system. lift station, storm <br />water system and roadway re- construction. Construction cost is $2.95 million. <br />NW 50 Avenue Streetscape Improvements I Oakland Park. Florida I Construction Manager <br />He was responsible for construction management of NW 5th Avenue from Oakland Park Boulevard to NW <br />38th Street. The project consisted of a water distribution system. a storm water system and roadway re- <br />construction. <br />Bid Pack #3 (Water Main) I Oakland Park. Florida I Construction Manager - Bid Pack #3 area covers <br />approximately 400 acres and is located west of 1 -95. south of Oakland Park Boulevard. The majority of the <br />project is water main replacement with pavement restoration. Mr. Shaver managed the construction <br />engineering services for approximately 12.000 linear feet of water main in the 400 acre area. This includes <br />the replacement of services throughout the mainly residential area and the addition of thirty five (35) fire <br />hydrants to maintain a maximum hydrant spacing of 500 feet in the area. <br />NE 380 Street Streetscape Improvements I Oakland Park. Florida I Construction Manager <br />Mr. Shaver was responsible for construction management for construction of NE 38th Avenue from NE 12th <br />Avenue to Federal Highway. The project consisted of a water distribution system, a storm water system, and <br />roadway re- construction. Construction cost is $3.3 million. <br />Harlem McBride Area Drainage Improvements I Oakland Park. Florida I Construction Manager <br />He was responsible for Construction management for drainage and roadway construction of Harlem McBride <br />area. The project consisted of a water distribution system, a storm water system. and roadway pavement <br />overlay. Construction cost is $500.000. <br />City of Greenacres Municipal Complex I Greenacres. Florida I Construction Manager - He was responsible for <br />Construction Management of the infrastructure for City Hall and Public Works. The project consisted of <br />installation of water distribution, sanitary sewer system. lift station. storm water system and roadway and <br />parking lot. <br />Southport Phase VII and VIII I Broward County. Florida I Construction Manager <br />Mr. Shaver was responsible for construction management of the Port Everglades Southport Container Yard <br />Project. The total construction cost for Phase VII and VIII of approximately $12 million dollars. Improvements <br />included water distribution. sanitary sewer. storm water improvements and container yard construction. <br />CRAVEN THOMPSON & ASSOCIATES. INC. 1 3563 NW 53,- STREET, FORT LAUDERDALE, FL 33309 1 P 954.739.6400 <br />3 1 Page 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.