My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Comtech - ITB 23-05-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-05-02) Golden Shores Pump Station Rehabilitation
>
Responses
>
Comtech - ITB 23-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2023 11:28:53 AM
Creation date
6/29/2023 11:27:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M0J1Cr11= <br />Golden Shores Pump Station Rehabilitation ITB 23-05-02 <br />C7PRO=E O. <br />18-2656 <br />I.M ATrnN <br />Sunny Isles Beach, FL <br />OWNER <br />City of Sunny Isles Beach <br />ITEM NO. DESCRIPTION QUANTIT <br />UNIT UNIT PRICE <br />TOTAL. <br />1 <br />General Requirements <br />1 <br />LS <br />$I..wnn9 <br />s105,1fe� <br />2 <br />Mobilization/Demobilization <br />1 <br />LS <br />IN.=N <br />s9e.aoo.00 <br />3 <br />Maintenance of Traffic <br />1 <br />LS <br />sie.9w.w <br />s+s.9w.w <br />4 <br />Prevention, Control and Abatement of Erosion and Water <br />Pollution <br />1 <br />LS <br />$18,000.00 <br />$18,000.00 <br />5 <br />Utility Designating and Locating <br />1 <br />LS <br />$4.w0.00 <br />$4,9w.w <br />6 <br />Clearing, Grubbing, Demolition, Removal, and Disposal <br />1 <br />LS <br />$++9.00000 <br />$++$mo.w <br />7 <br />Earthwork, Excavation, Embankment, and Site Grading <br />1 <br />LS <br />$85,000.00 <br />$85,000.00 <br />8 <br />Catch Basins <br />1 <br />EA <br />$+410.0 <br />s+4.mm <br />9 <br />HP Storm Gray Pipe (Flgh Performance Polypropylene <br />Pipe) <br />28 <br />LF <br />$2,300.00 <br />$64,400.00 <br />10 <br />Modify Existing Manholes/Catch Basins <br />1 <br />LS <br />$45,000.00 <br />$45,000.00 <br />11 <br />Drainage Structure./Trash Interceptor Modification <br />1 <br />LS <br />12 <br />Plugging/Sealing 42" Sluice Gate Pipe Opening and <br />Grouting/Abandoning42' Pipe <br />1 <br />LS <br />$82,000.00 <br />$62,000.00 <br />13 <br />Drainage Pipe Joint Repair <br />1 <br />LS <br />$17510.00 <br />$175,0000 <br />14 <br />Retaining Wall <br />1 <br />LS <br />ss9,wo.w <br />Mmw <br />15 <br />Concrete Header Curb and Type D Curb <br />1 <br />LS <br />U=.w <br />s410.w <br />16 <br />Concrete Slab/Driveway/Sidewalk (6" Thick) <br />6 <br />SY <br />s5w.w <br />"a M.w <br />17 <br />Asphalt Driveway/ halt Pavement Reconstruction <br />254 <br />SY <br />$+04.w <br />$95.4+aw <br />18 <br />Pump Station Structural/Architectural Work <br />1 <br />LS <br />:9$5101 <br />s9ss,wo.w <br />19 <br />Pump Station Mechanical Work <br />I <br />LS <br />20 <br />Pump Station Electrical Work <br />l <br />LS <br />Uu.aw.w <br />ssas.aw.w <br />21 <br />Pump Station Instrumentation Work <br />I <br />LS <br />Ummm <br />UMN000 <br />22 <br />Pump Station Standby Power System <br />I <br />LS <br />sam,wono <br />Uw,w0.00 <br />23 <br />FPL Service Relocation <br />I <br />LS <br />U+Aw.w <br />24 <br />Black Picket Fence, Gate, and Bollards <br />I <br />LS <br />$5,.00.00 <br />s9+.ow.w <br />25 <br />Existing Tree Protection and Removal <br />I <br />LS <br />s,.wo.w <br />s+.m w <br />26 <br />Sod and Irrigation Restoration <br />1 <br />LS <br />s+s.9w1 <br />t+awo.w <br />27 <br />Temporary portable pump rental to by-pass the station, <br />6,000gpmeach <br />2 <br />EA <br />$51,000.00 <br />$102,000.00 <br />28 <br />Permitting Allowance <br />1 <br />LS 1 <br />$ 10,000.00 <br />$ 10,000.00 <br />SUBTOTAL <br />0.9n.m.w <br />29 <br />Performance Bond <br />I <br />LS <br />MOWN <br />30 <br />Overhead and profit <br />I <br />LS <br />fional Item R'm'vaI/Dla osal of Unsuitable Soils and <br />150 <br />CY <br />$9.001 <br />TOTAL COST <br />Wn.M.w <br />Signature, I hereby attest that I have the authority to sign this notarized certification and certify that the above referenced information is true, <br />complete and correct. <br />1T3 23-15-0'L 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.