My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3540
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2023 11:55:22 AM
Creation date
8/25/2023 1:20:30 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3540
Date (mm/dd/yyyy)
08/17/2023
Description
Amending & restating Reso 2023-3503, ITB 23-02-02, approving agreement w/ Sleiman Construction, LLC for the Meditation Garden at Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />This review time is only for correctly submitting pricing. Submitted pricing found not <br />to be in correct format, or containing pricing that relates to Work clearly not part of the <br />change, or contains Sub- Contractor pricing not in the correct format, or contains Sub - <br />Contractor pricing that relates to Work clearly not part of the change, will not be reviewed <br />and returned to the Contractor for proper submission and as such, no Contractor claims for <br />delay will be accepted as a result of extended response time due to improper pricing <br />submission. <br />10.3.2.6 The City's Representative will review properly submitted Contractor pricing <br />and compare submitted pricing with published pricing data contained in the Building Cost <br />Data, Mechanical Cost Data and Electrical Cost Data, latest edition, as published by R.S. <br />Means Company, Inc. Contractor submitted pricing found to be in excess of five (5%) <br />percent above the stated published pricing will not be accepted and as such, no Contractor <br />claims for delay will be accepted as a result of extended response time due to excessive <br />pricing submittal by the Contractor. <br />10.3.3 The value of any change ordered under the Contract for extra work or any <br />reductions in work required, shall be determined under one or more of the following <br />procedures before a written change order is issued. <br />10.3.3.1 By Unit Price named in the contract or subsequently agreed upon by the <br />City and the Contractor, which prices shall include Contractor's overhead and profit. <br />10.3.3.2 By Lump Sum Price agreed upon by the City and the Contractor, which <br />price shall include overhead and profit. A breakdown of the estimated costs comprising <br />the lump sum price may be required by the City's Representative for review. Percentage <br />for overhead and profit shall be determined in accordance with the method listed <br />described under Overhead and Profit below. <br />10.3.3.3 By a Cost -Plus Price on total actual costs, plus an added percentage, <br />all determined as described under Overhead and Profit below. <br />10.3.3.4 Overhead and Profit <br />(a)Subcontractor's overhead, including supervision and the furnishing, use and <br />maintenance of small tools and ordinary equipment incidental to and required for the <br />Work shall be just and fully compensated for by adding an amount equal to FIVE <br />PERCENT (5%) of the sum of material and labor costs as defined under Subcontractor's <br />profit below, but excluding documented equipment rental costs. <br />(b) Subcontractor's profit may then be added to the above material costs and <br />labor costs including the Overhead allowance at the rate of SEVEN PERCENT (7%) <br />of the sum of those costs, excluding equipment rental costs. <br />(c) Contractor's overhead, including general supervision and the furnishing, use <br />and maintenance of small tools incidental to and required for the Work accomplished <br />by its own direct labor shall be considered to be just and fully compensated for by <br />adding an amount equal to FIFTEEN PERCENT (15%) of the sum of material and <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.