Laserfiche WebLink
PROPOSAL *Negotiated* <br />FROM: <br />Contour Marine Incorporated <br />1040 Adams Street PAGE NO. 1 OF 1 PAGES <br />Hollywood, FL 33019 DATE: 8/2/2023 <br />Office: (800) 577-7005 Cell: (954) 849-9186 <br />Fax: (954) 920-4762 <br />PROPOSAL SUBMITTED TO: <br />City of Sunny Isles Beach <br />Marine Division of Police <br />18070 Collins Ave. <br />Sunny Isles Beach, FL 33160 <br />(305) 947-0606 <br />JOB NAME: Boatlift for SIB Marine Police <br />We hereby submit specifications and estimate for: <br />1. Mobilize barge, crane, all necessary materials, and labor crew to job site. <br />2. Supply and drive eight (8) 12" x 12" x 25' prestressed concrete boat lift pilings, driven to refusal. <br />3. Supply and install two (2) 16,000 pound capacity DECO CONCEPT CRS boat lifts with remote control, limit <br />switch, cable retention system, stainless steel motors, sealed direct drive gear boxes, and aluminum bunks. <br />4. Supply and install four (4) DECO 15 %2" x 24' aluminum walkways with a connecting work platform at the stern. <br />There will be a walkway on the port and starboard side of each boatlift. <br />5. Provide all necessary electrical connections from pedestals to boat lifts. Pedestals to be done by others and <br />supplied by others. <br />6. All work will be done according to state licensed engineering and in compliance with all applicable municipal and <br />county codes. <br />7. All plans, engineering costs, expediting of permits, city and county fees are included in this price. <br />8. In addition to DECO's boat lift warranty, Contour Marine will warrant installation of pilings and boat lift for a <br />period five (5) years assuming reasonable maintenance of the boat lifts. <br />9. Contour Marine agrees to a bi-annual Preventative Maintenance for a period of 1 year. <br />We herebypropose to furnish labor and materials -complete in accordance with the above specifications, for the sum of <br />Ninety -Six Thousand Five Hundred Dollars ($96,500.00 ) with payments to be made as follows: 10% deposit due upon <br />signing of contract. $25,000 due when permits are received and work commences. $20,000 due when pilings are driven. <br />$35,000 when boat lifts are delivered to fob site. Final balance due when all work is completed. <br />All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above <br />specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. All debris will be removed from <br />the premises and disposed of in an environmentally recommended manner. Payments are due immediately upon billing. Late payments are subject to 2% interest/month and <br />work will cease until payment is made. Final payment is due when the project is complete as described in the contract. A courtesy hold back of $500 may be retained <br />pending final inspection. <br />Authorized <br />CLK4a91IGVto) WOW9-ITAE63Y:\Il <br />The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. <br />ACCEPTED: <br />DATE <br />Signature <br />Signature <br />238 <br />