My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3558
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 12:46:22 PM
Creation date
10/2/2023 2:01:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3558
Date (mm/dd/yyyy)
09/21/2023
Description
Agreement w/ Team Contracting, Inc., to replace the storm Drainage at Pier Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Detailed Scope of Work <br />GaiHU'J�,i�'r �I. <br />To: Rudy Ayan From: Richard Labinsky <br />Team Contracting, Inc. Sunny Isles <br />13911 SW 42nd St. Suite 209 18070 Collins Ave <br />Miami, FL 33175 Sunny Isles, FL 33160 <br />305-207-9799 305-792-1817 <br />Date Printed: September 06, 2023 <br />Work Order Number: 120784.00 <br />Work Order Title: City of Sunny Isles Beach - Piers Park Drainage Repairs <br />Brief Scope: <br />Preliminary FIRevised ❑X Final <br />The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the <br />items set forth below shall be considered part of this scope of work. <br />Please see the attached Scope Work. <br />Subject to the terms and conditions of JOC Contract FL-R10-GC03-111821-TCI. <br />Contractor Date <br />Owner <br />Date <br />Scope of Work Page 1 of 1 <br />9/6/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.