Laserfiche WebLink
Sourcewell 17 <br />Detailed Scope of Work <br />To: Rudy Ayan <br />Team Contracting, Inc. <br />13911 SW 42nd St. Suite 209 <br />Miami, FL 33175 <br />305-207-9799 <br />Date Printed: July 27, 2023 <br />From: Richard Labinsky <br />Sunny Isles <br />18070 Collins Ave <br />Sunny Isles Beach, FL 33160 <br />305-792-1817 <br />Work Order Number: 118430.00 <br />Work Order Title: City of Sunny Isles Beach - Samson Park Roof & Ceiling Repairs <br />Brief Scope: <br />F]Preliminary <br />0 Revised <br />❑X Final <br />The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the <br />items set forth below shall be considered part of this scope of work. <br />SCOPE OF WORK Topside of Roof/ Roofing: On entire roof deck remove all loose trash & debris.. As per manufactures <br />specification install GAF UCC Cleaner on walls & entire roof deck. On concrete walls & roof deck remove all loose <br />debris blisters & damaged waterproofing system. Install 1 -Coats of GAF UniTile LV Sealer Primer, as needed. On <br />concrete deck & vertical walls seal any cracks, holes, joints joint cracks with GAF Topcoat Flex Seal Caulk Grade Flash <br />entire perimeter flashings, drains, posts, penetrations etc. overflow scuppers, install GAF TopCoat Flex Seal GAF 6" or <br />12" GAF Reinforced Polyester Fabric & GAF TopCoat Flex Seal, as needed. On the entire vertical wall install 2 coats of <br />GAF TopCoat Surface Seal SB. Install 1 st coat of GAF TopCoat Surface Seal SB on entire roof deck & flashings @a <br />Rate of 1.5 Gallons Per Sq. Install 2nd coat of GAF TopCoat Surface Seal SB on entire roof deck & flashings @a Rate <br />of 1.5 Gallons Per Sq. Remove all materials equipment & debris from roof deck & grounds. Underside of Roof/ Exposed <br />Ceiling: Cut, chip, or scrape as necessary at delaminated stucco and/or concrete deck rust spots. Remove and dispose <br />of debris. Cut & dispose of oxidated reinforcement chairs. Apply coatings of corrosion inhibitor as per manufacturer <br />recommendations. Patch stucco & deck with concrete repair product to match existing finish. Paint entire exposed & <br />exterior ceiling. Provide surface protection. Includes: Louvers Wall Patches Excludes: Design. Permit fees, if applicable. <br />Subject to the terms and conditions of JOC Contract FL-R10-GC03-111821-TCI. <br />2 4o—' zp Zoz3 <br />Co tractor Date <br />Owner <br />Date <br />Scope of Work Page 1 of 1 <br />7/27/2023 <br />