Laserfiche WebLink
rno�acr xrrca <br />_, ,_�.. _ . _ . <br />Golden Shores Pump Station Rehabilitation ITB 23-05-02 <br />cc�►xwecrrro. <br />18-2656 <br />Sunny Isles Beach, FL <br />f1WNTuR <br />City of Sunny Isles Beach <br />ITEM NO, . ; DE5CRIETION <br />tQUANTIT <br />UNIT UNIT PEtICD <br />TOTAL <br />1 <br />General Requirements <br />1 <br />LS <br />$105.000.00 <br />$165.000.00 <br />2 <br />Mobilization/Demobilization <br />1 <br />LS <br />$36;000:00 <br />$36.000.00 <br />3 <br />Maintenance of Traffic <br />1 <br />LS <br />$16,300.00 <br />$20.300.00 <br />4 <br />Prevention, Control and Abatement of Erosion and Water <br />Pollution <br />1 <br />LS <br />$18,000.00 <br />$18,000.00 <br />5 <br />Utility Designating and Locating <br />1 <br />LS <br />s4.9-00 <br />$1.000.00 <br />6 <br />Clearing, Grubbing, Demolition, Removal, and Disposal <br />1 <br />LS <br />$110.000.00 <br />$,19.000.00 <br />7 <br />Earthwork, Excavation, Embankment, and Site Grading <br />1 <br />LS <br />$85,000.00 <br />$85,000.00 <br />8 <br />Catch Basins <br />1 <br />EA <br />s14.000.00 <br />$14.000.00 <br />9 <br />HP Storm Gray Pipe (High Performance Polypropylene <br />Pipe) <br />28 <br />LF <br />$2300.00 <br />$64,400.00 <br />10 <br />Modify Existing Manholes/Catch Basins <br />1 <br />LS <br />$45,000.00 <br />$45,000.00 <br />11 <br />Drainage Structure/Trash Interceptor Modification <br />1 <br />LS <br />s14.000.00 <br />$14.000.60 <br />12 <br />Plugging/Sealing 42" Sluice Gate Pipe Opening and <br />Grouting/Abandoning42" Pie <br />1 <br />LS <br />$62,000.00 <br />$62,000.00 <br />13 <br />Drainage Pipe Joint Repair <br />1 <br />LS <br />$175.000.00 <br />$175.000.06 <br />14 <br />Retaining Wall <br />1 <br />LS <br />s79.00o.a0 <br />$39,000.09 <br />15 <br />Concrete Header Curb and Type D Curb <br />1 <br />LS <br />$4.200.00 <br />S4z00M <br />16 <br />Concrete Slab/Driveway/Sidewalk (6" Thick) <br />6 <br />SY <br />5500.00 <br />53.000.w <br />17 <br />Asphalt Driveway/Asphalt Pavement Reconstruction <br />254 <br />SY <br />5104.00 <br />$26.416.00 <br />18 <br />Pump Station Structural/Architectural Work <br />1 <br />LS <br />$965,000.00 <br />$965.000.00 <br />19 <br />Pump Station Mechanical Work <br />1 <br />LS <br />$715.000.00 <br />$715.000.00 <br />20 <br />Pump Station Electrical Work <br />1 <br />LS <br />$555.000.00 <br />$665.000.00 <br />21 <br />Pump Station Instrumentation Work <br />1 <br />LS <br />$215.00"" <br />5x15.000.00 <br />22 <br />Pump Station Standby Power System <br />1 <br />LS <br />$260.000.00 <br />$260.000.60 <br />23 <br />FPL Service Relocation <br />1 <br />LS <br />531.000.00 <br />531.000.00 <br />24 <br />Black Picket Fence, Gate, and Bollards <br />1 <br />LS <br />$51,000.00 <br />s5lxmoa <br />25 <br />Existing Tree Protection and Removal <br />1 <br />LS <br />$1.050.00 <br />51.050.00 <br />26 <br />Sod and Irrigation Restoration <br />1 <br />LS <br />x13.500.00 <br />$13.500.00 <br />27 <br />Temporary portable pump rental to by-pass the station, <br />6,000 gpm each <br />2 <br />EA <br />$51,000.00 <br />$102,000.00 <br />28 <br />Permitting Allowance <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />SUBTOTAL <br />$3,979.76G.00 <br />29 <br />Performance Bond <br />1 <br />LS <br />$90.600.00 <br />30 <br />Overhead and profit <br />1 <br />LS <br />$,19.000.00 <br />Optional Item Removal/Disposal of Unsuitable Soils and <br />150 1 <br />CY <br />$3.000.00 <br />TOTAL COST <br />s/.192a6a.00 <br />Signature, I hereby attest that I have the authority to sign this notarized certification and certify that the above referenced information is true, <br />complete and correct. <br />