Laserfiche WebLink
CITY OF SUNNY ISLES BEACH <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net |Purchasing@sibfl.net <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />Performance Standards: The desired results established for each type delivered in person to the individual or to a <br />of Work described in the ITB, necessary to be member of the firm or to an officer of the <br />deemed Satisfactory. corporation for whom it is intended, or to an <br />authorized representative or such individual, <br />Project: A task or series of tasks that the Contractor firm, or corporation, or if delivered at or sent <br />must complete in accordance with the by registered mail to the last business <br />Contract Documents. address known to them who gives the <br />notice. Unless otherwise stated in writing, <br />Project Manager: The individual(s) assigned by the City any notice to or demand upon the City under <br />Manager or designee to manage the project. this Contract shall be delivered to the City. <br />Quality Assurance: Those actions taken by <br />the City to assure Services meet the 1.31 BID AWARD: <br />Satisfactory Performance Standards <br />established by the Contract Documents. The City reserves the right to reject any and all Bids at its sole discretion. <br />Bids shall be awarded by the City after the City performs all necessary <br /> <br />Quality Control: Those actions taken by the Contractor to searches, inquiries, exploration, and analysis of the Bids. The Bid shall be <br />awarded to the lowest responsible and responsive Bidder whose Bid best <br />ensure the Contractor’s performance meets <br />the Performance Standards. serves the interests of and represents the best value to the City in <br /> conformity with the criteria set forth in Section 62-8 of the City Code. No <br />Re-Work:Corrective Work performed by the Notice of Award will be given until the City has concluded any <br />Contractor, at no cost to the City, to meet investigation(s) as they deem necessary to establish the Bidder’s capability <br />the Performance Standards. to perform the Services as described in this RFP, ITB, RFQ or ITQ, as <br /> substantiated by the required professional experience, client references, <br />Responsive Bidder: The Bidder whose Bid conforms in all technical knowledge and qualifications; and sufficient labor and <br />material respects to the terms and equipment to comply with the City’s established standards, as well as the <br />conditions included in the ITB. financial capability of the Bidder to perform the Work in accordance with <br /> the Contract Documents to the satisfaction of the City within the time <br />Responsible Bidder: The Bidder who has the capability in all prescribed. The City reserves the right to reject the Bid of any Bidders on <br />respects to perform in full the contract the basis of these queries and investigations and who does not meet the <br />requirements, as stated in the ITB, and the City’s satisfaction, even though the firm may be the lowest dollars and <br />integrity and reliability that will assure good cents Bid. In analyzing Bids, the City will also take into consideration client <br />faith performance. references, past work experience and work product, proven ability to <br /> satisfactorily perform. If the Contract is awarded, the City will issue the <br />Samples: Physical examples which illustrate materials, Notice of Award and give the successful Bidders a Contract for execution <br />equipment or workmanship and establish within ninety (90) days after opening of Bids. The City specifically reserves <br />standards by which the Work will be judged.the right to award the contract to a Bidder who is not necessarily the <br /> lowest dollars and cents Bidders on the basis of the results of these queries <br />Satisfactory: Work performed by the Contractor that has and investigation(s). <br />been determined through City inspection to <br />meet the Performance Standards. 1.32 EXECUTION OF AGREEMENT: <br /> <br />At least four counterparts of the Agreement, the Performance Bond, the <br />Site(s): The location(s) where Work is to be <br />performed under this Contract.Certificates of Insurance and such other Documents as required by the <br />Contract Documents shall be executed and delivered by Contractor to the <br /> <br />Specifications: Those portions of the Contract Documents City within ten (10) calendar days of receipt of the Notice of Award. <br /> <br />consisting of written technical descriptions <br />of materials, equipment, construction 1.33LAWS AND REGULATIONS: <br />systems, standards and workmanship as <br />applied to the Work. The Contractor will give all notices and comply with all laws, ordinances, <br /> rules and regulations applicable to the Work. If the Contractor observes <br />Statement of Services: The form furnished by the City which is to be that the Specifications are at variance therewith, they will give the City <br />used by the Contractor in requesting prompt written notice thereof, and any necessary changes shall be <br />progress payments. adjusted by an appropriate modification. If the Contractor performs any <br /> Work knowing it to be contrary to such laws, ordinances, rules and <br /> regulations, and without such notice to the City, they will bear all costs <br />Subcontractor: A person, firm, or corporation having a direct arising wherefrom. <br />Contract with Contractor, including one who <br />furnishes material, equipment or services 1.34TAXES: <br />necessary to perform the Work. <br /> The City of Sunny Isles Beach and City of North Miami Beach are exempt <br />from sales tax imposed by the State and/or Federal Government. Florida <br />Supplier: Any person or organization who supplies <br />materials or equipment for the Work, Sales Tax Exemption No.from SIB,23-00-477131-54Cand from NMB,85- <br />including that fabricated to a special design, 2012740150C-3 appear on each purchase order. Exemption certificates <br />but who does not perform labor at the site. are available upon request. <br /> <br />Work: Any and all obligations, duties and 1.35DUTY TO DEFEND, INDEMNIFY AND SAVE HARMLESS: <br />responsibilities necessary to the successful <br />completion of the Project assigned to or In consideration of the separate sum of twenty-five dollars ($25.00) and <br />other valuable consideration, the Contractor shall defend, indemnify and <br />undertaken by Contractor under the <br />Contract Documents, including all labor, hold harmless the City, its officers, agents and employees, from or on <br />materials, equipment and other incidentals, account of any injuries or damages, received or sustained by any person or <br />and the furnishing thereof. persons during or on account of any operations connected with the Work <br /> described in the Contract Documents, or by or in consequence of any <br />Written Notice: The term “Notice” as used herein shall mean negligence in connection with the same; or by use of any improper <br />materials or by or on account of any act or omission of the said Contractor <br />and include all written notices, demands, <br />instructions, claims, approvals and or his Sub-Contractor, agents, servants or employees. The Contractor will <br />defend, indemnify and hold harmless the City and their agents or <br />disapproval’s required to obtain compliance <br />with Contract requirements. Written notice employees from and against all claims, damages, losses and expenses <br />including attorneys' fees arising out of or resulting from the performance <br />shall be deemed to have been duly served if <br />7 <br /> <br /> <br />