Laserfiche WebLink
N rJn , Calvin, Giordano & Associates, Inc. <br />��! E E C E P T 1 0 B A L S O L U T I O N S <br />N 0 <br />NEWPORT FISHING PIER <br />Sunny Isles Beach, Florida <br />The City had already completed several CIP projects with CGA, so when it came time to <br />select the turn -key Project Managers for the Newport Fishing Pier demolition, design, <br />permitting and reconstruction. The design and permitting of the pier required <br />coordination with FDEP, DRER, USACE, USCG, MD Fire Department and the City's <br />building department. The scope of work also included site inspections, vibration & <br />settlement monitoring, and the administration of all budgets, claims, change orders, RFI <br />and contract addenda. <br />After successfully permitting the pier, CGA managed the demolition of the existing pier <br />and the construction of the 776 -foot long pier, which included a 6,200 sf restaurant and <br />second story lifeguard office and observation tower. The pier decking was placed atop <br />24 "x24" precast- driven piles. The project also required the design, permitting and <br />installation of new utility lines from Collins Ave. <br />CGA is proud to announce the Newport Fishing Pier opened on time and $127,000 <br />under budget with a grand opening party being held on the pier on June 16, 2013. <br />Client <br />City of Sunny Isles Beach <br />Contact information <br />at time of project: <br />Bill Evans <br />Asst City Manager <br />18070 Collins Ave <br />Sunny Isles Beach, FL <br />33160 <br />(305) 947 -0606 <br />Project Date <br />2011 -2013 <br />Services Provided <br />Project Management <br />Permitting <br />Construction Services <br />Surveying Support Services <br />Principal -in- Charge <br />Dennis J. Giordano <br />Team Members <br />Joel Wadsworth, CGC <br />Chris Giordano, MSC <br />CO_0003 SIB NEWPORT FISHING MUM I is <br />