My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Calvin Giordano & Assoc. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:25:05 AM
Creation date
8/28/2014 2:59:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering Svcs.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FLAGLER MEMORIAL MONUMENT SOLAR LIGHTING <br />Miami Beach, Florida <br />This project was awarded to CGA on June 5, 2014 and involves the design and <br />specification of a solar lighting system to illuminate the historical Flagler obelisk <br />monument on Flagler Memorial Island. Constructed in the early 1920's by Carl Fisher as <br />a memorial to Henry H. Flagler, the monument has required numerous restoration <br />efforts in its history. The original lighting for the monument was installed in 1940 as <br />part of one of the first restoration projects. Over the years, other projects have added <br />fill material to protect the monument, removed graffiti, installed a security perimeter <br />fence, and resurfaced the monument. In 2002, the island was officially designated as a <br />historic site by the City of Miami Beach Historic Preservation Board. The proposed solar <br />powered system will replace the existing grid -tied FPL service to the island (a <br />submarine cable) which was frequently being damaged by boats and watercraft. <br />Funding for the project is being provided by a combination of the City of Miami Beach, <br />the adjoining Star Island homeowner's association, and FPL. The project is currently <br />under design by CGA electrical staff and is expected to begin construction in the Fall of <br />2014. <br />Client <br />City of Miami Beach <br />Contact information <br />at time of project: <br />Edgar Zapata <br />Contract Coordinator <br />Public Works - Property <br />Management Division <br />edgardzapata@ <br />miamibeachfl.gov <br />1245 Michigan Avenue <br />Miami Beach, FL 33139 <br />P:(305)673- 7000x2964 <br />Project Date <br />June 2014 <br />Services Provided <br />Electrical Engineering <br />Survey (3D- Scanning) <br />Principal -in- Charge <br />Dennis J. Giordano <br />Team Members <br />Manny Docurro, PE <br />Steve Watts, PSM <br />Greg Clements, PSM <br />Keith Brien <br />EL_0009 FLAGLER MONUMENT SOLAR LIGHTING.DOC 1 17 <br />Calvin, Giordano 5 Associates, Inc. <br />r <br />E x C E P T 1 0 N A t S O L U T 1 0 N 5 <br />FLAGLER MEMORIAL MONUMENT SOLAR LIGHTING <br />Miami Beach, Florida <br />This project was awarded to CGA on June 5, 2014 and involves the design and <br />specification of a solar lighting system to illuminate the historical Flagler obelisk <br />monument on Flagler Memorial Island. Constructed in the early 1920's by Carl Fisher as <br />a memorial to Henry H. Flagler, the monument has required numerous restoration <br />efforts in its history. The original lighting for the monument was installed in 1940 as <br />part of one of the first restoration projects. Over the years, other projects have added <br />fill material to protect the monument, removed graffiti, installed a security perimeter <br />fence, and resurfaced the monument. In 2002, the island was officially designated as a <br />historic site by the City of Miami Beach Historic Preservation Board. The proposed solar <br />powered system will replace the existing grid -tied FPL service to the island (a <br />submarine cable) which was frequently being damaged by boats and watercraft. <br />Funding for the project is being provided by a combination of the City of Miami Beach, <br />the adjoining Star Island homeowner's association, and FPL. The project is currently <br />under design by CGA electrical staff and is expected to begin construction in the Fall of <br />2014. <br />Client <br />City of Miami Beach <br />Contact information <br />at time of project: <br />Edgar Zapata <br />Contract Coordinator <br />Public Works - Property <br />Management Division <br />edgardzapata@ <br />miamibeachfl.gov <br />1245 Michigan Avenue <br />Miami Beach, FL 33139 <br />P:(305)673- 7000x2964 <br />Project Date <br />June 2014 <br />Services Provided <br />Electrical Engineering <br />Survey (3D- Scanning) <br />Principal -in- Charge <br />Dennis J. Giordano <br />Team Members <br />Manny Docurro, PE <br />Steve Watts, PSM <br />Greg Clements, PSM <br />Keith Brien <br />EL_0009 FLAGLER MONUMENT SOLAR LIGHTING.DOC 1 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.