Laserfiche WebLink
A p7g, <br />Calvin . Giordano & Associates, Inc. <br />E x C E P T l 0 `1 A t 5 0 E U T 1 0 N i <br />p <br />® Tammy Cook - Weedon, ASLA, RLA, LEED AP <br />® Associate, Director of Landscape Architecture <br />® SUMMARY OF QUALIFICATIONS <br />Ms. Cook - Weedon leads the Landscape Architectural staff, founded on her over 2S years <br />® of Landscape Architectural experience with demonstrated strengths in creative design, <br />® graphic presentations, and planting design. She has successfully completed numerous <br />large scale projects which encompassed design studies, planting designs, and the various <br />intersecting professions and tasks necessary to manage the projects through to comple- <br />® tion. <br />® PROJECT EXPERIENCE <br />® North Shore Neighborhood Improvements, Miami Beach, FL <br />® Landscape Architect <br />® Client: City of Miami Beach: Implemented the City's BODR and designed the planned <br />improvements, including character landscaping, streetscapes, parking, lighting, ADA ac- <br />0 cess and waterline replacement for more than eight miles of urban, neighborhood corri- <br />® dors. <br />® Hickory Point Recreational Facilities, Tavares, FL <br />® Landscape Architect <br />Client: Lake County Water Authority: The project consisted of the site design of a wa- <br />® terfront park that included marinas, boat ramps, wetland educational boardwalks, envi- <br />® ronmental signage, fishing stations and a communal pavilion. <br />® Kane Concourse Beautification, Bay Harbor Islands, FL <br />O Landscape Architect <br />Client: Town of Bay Harbor Islands: Developed streetscape improvements for the <br />• town's business district, including specialty paving, street furnishings, wayfinding, land- <br />0 scape planting and irrigation, with particular attention to maintaining the existing Miami <br />® Modern architectural quality as a branding element of the corridor. <br />® Joe DiMaggio Children's Hospital Visitor's Clubhouse, Hollywood, FL <br />® Landscape Architect /Project Manager <br />Client: Memorial Healthcare System: Prepared the site and landscape design for a re- <br />0 storative garden with a playground area specifically for the use by children users of the <br />® Joe DiMaggio facility. <br />® Gator Run Park, Weston, FL <br />• Client: City of Weston: Passive park design for a S -acre community park including light- <br />0 ing improvements, continuous walking paths, children's play equipment, planting and ir- <br />rigation design. The design provided a butterfly garden and shade structures in proximi- <br />® ty to and to build strong connections with the adjacent elementary school. <br />® Deering Estate at Old Cutler, Palmetto Bay, FL <br />® Client: Miami -Dade County Park and Recreation Department: Historical restoration <br />® and landscape design to repair the damaged areas of the estate following Hurricane An- <br />drews devastation of the property, including detailed archaeological planting design, hab- <br />itat restoration and planting design for a new visitors' facility. <br />® Sombrero Beach Park, Marathon, FL <br />® Client: City of Marathon: Park master plan and design for the creation of a beach -front <br />® park with dune access, volleyball courts, playgrounds, beach amenities, dune and turtle <br />nesting habitat restoration. <br />B <br />