Laserfiche WebLink
B <br />0 <br />Calvin. Giordano & Associates, Inc. <br />% E S C E P T 1 0 N A L s O L U T 1 0 N s <br />Thomas Francis Lubanovic, P.E., S.E., P.S.M., Page 2 <br />Manager- Civil /Structural Department, JNE Consulting Engineer's (10/2008 to 2/2010) <br />JNE Consulting is a Canadian based engineering firm in industrial projects, civil & structural engineering. As the <br />Manager of the Civil /Structural group, 1 supervised and coordinated the Civil /Structural Department f or heavy <br />industrial projects throughout the United States & Canada. <br />Worked Directly for Edward Price, General Manager- Export Office y Supervised staff of 1 0 -14 Engineers, EIT & <br />CADD Personnel y Reviewed structural reports using STAAD & other computer software y Billable Project Related <br />time- 65% (Average) Management of JNE Document Management System per /SO Standards y Major Projects <br />included: <br />• Arcelor Mittal Indiana Harbor, Indiana- Pulverized Coal Injection Facility Design <br />• TKS Furnace & Galvanizing Line, Alabama- Structural Analysis & Design <br />• Shenango Coke Works, Neville Island, PA - Forensic Structural Design <br />• DTE Tar Sludge Recycling Facility, Detroit, MI- Structural & Foundation Design <br />• QAIQC of all outgoing structural documents, drawings & reports <br />Sr. Project Engineer, Murray Associates, Inc. Associate (6/2007 to 10/2008) <br />Murray Associates, Inc. is an engineering consulting firm specializing in civil & structural engineering, geotechnical <br />design & analysis and land surveying. The projects I supervised were primarily residential & small commercial <br />applications. <br />Worked Directly for the President - Mr. Jack Murray, P.E. and Supervised staff of One EIT & 2 -CADD Personnel y <br />Reviewed time sheets, project budgets, etc. y Billable Project Related time- 85% (Average) y Major Projects included: <br />• ABC Beverage Corporation, Verona, PA - Caisson Design <br />• Arcadia Industrial Company, Indiana, PA - Crane Rail & Foundation Design <br />• Lami Grubb Architects, West Miffin, PA -Site Development <br />• St Barbara's Catholic Church, Collier Township, PA -Site Development Final review of all outgoing structural <br />documents, drawings & reports <br />Sr. Highway & Project Engineer, T.Y. Lin International (9/2006 to 6/2007) <br />T. 1'. Lin International is an engineering consulting business specializing in civil engineering, bridge & roadway <br />design & land development. As a Senior Project Engineer in the Fort Myers office, I supervised, and coordinated <br />local road and stormwater applications. <br />Worked Directly for Mr. James Molnar, P.E., Manager- Fort Myers Branch y Supervised staff of 2 CADD Personnel and <br />Billable Project Related time - 90% (Average). Major Projects included: <br />• City of Fort Myers - SWMM H & H Analysis of Stormwater Canal System <br />• Burnt Store Road - Cape Coral - Highway Design & Stormwater Management <br />• Plantation Road Extension - Lee County- Highway design, estimating & specifications <br />• Gator Circle- Cape Coral - MOT & MUTCD <br />Ern <br />