My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Calvin Giordano & Assoc. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:25:05 AM
Creation date
8/28/2014 2:59:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and Engineering Svcs.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Calvin, Giordano & Associates, Inc. <br />r A.c..{z, E C C E P i 1 O R A E S O E U i 1 O S <br />crete separators and concrete light poles at the end of <br />a corridor that was just designed by others with new <br />landscaping, brick -paver islands and antique verde <br />green street lamps as part of another enhancement <br />project. <br />Post - Construction Re- Examination - This post - <br />construction evaluation process is a process that CGA <br />undertakes at the end of certain projects in order <br />to learn more about what could have been done to <br />produce an even better design. Much of the time, we <br />examine contractor's requests for information or <br />unanticipated change orders that occurred during <br />construction. Sometimes we find that items that <br />may have seemed clear to the engineer or designer <br />were not clear or were misinterpreted in the field <br />by the contractor. Sometimes contractors try to find <br />ways to invoke change orders, but other times, there <br />are legitimate issues with the plans provided. As an <br />example, we often find that the provision of additional <br />details, special details or more specific of notes would <br />have alleviated many of these issues, and therefore we <br />try to include these items in future plans. <br />ABILITY TO MEET DESIRED <br />TIME -LINES AND DEADLINES <br />The CGA Team constantly strives to deliver a high <br />quality product to our client at or before the scheduled <br />deadline. CGA will enlist all needed team members to <br />ensure deliverables are provided to the City in an ex- <br />pedited fashion. CGA accomplishes this task by keep- <br />ing all channels of communication open amongst team <br />members and coordinating in -house project meet- <br />ings to make sure project milestones are being met as <br />planned. Communication amongst our large group of <br />experts will allow CGA to expedite project schedules. <br />The CGA Team can assist the City with ensuring the <br />City of Sunny Isles Beach residents and businesses are <br />given a high quality product in the most cost effective <br />manner. Throughout construction, it's crucial to main- <br />tain open communication between the contractor and <br />design team to minimize the number of submitted <br />change orders. <br />This process allows all parties involved to remain on <br />schedule and meet the budget goals. This project's <br />prime focus is obtaining a permanent, cost effective <br />and regulatory compliant solution to a specific issue <br />and will require clearly defined project objectives and <br />a detailed and concise scope definition from project <br />inception. <br />RFQ No. 14 -07 -02 1 Continuing Professional Services 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.