My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Wolfberg Alvarez & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:04:32 PM
Creation date
8/28/2014 3:19:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Architectural and svcs.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t, r, <br />August 6, 2014 <br />Mr. Marcel Morlote <br />Senior Vice President <br />Wolfberg Alvarez & Partners <br />3225 Aviation Ave., Suite 400 <br />Miami, FL 33133 <br />Dear Mr. Morlote, <br />CITY OF SUNNY ISLES BEACH <br />RFO No. 14 -07 -02 ys <br />WOLFBERG ALVAREZ & PARTNERS <br />wanted to take a moment to share with you and your firm our appreciation for the <br />architectural, engineering, and construction services Wolfberg Aharez & Partners has <br />provided the City of Doral to date on its new Public Works Facility and Police <br />Department projects. <br />The first phase of the project, the Public Works facility, couldn't have been managed <br />better. The project was delivered on -time and note penny over the 56,000,000 budget. <br />Not to mention that your team was successful in obtaining LEED Gold certification even <br />though the firm of Wolfberg Alvarez & Partners was only contractually obligated to <br />LEED Silver. Kudos! Phase two of the project came about through new administration <br />and WA was then tasked with providing additional space and construction to house the <br />city's new police facility as well. That added additional square footage to the building <br />bringing the project to 46,000 SF. <br />Your team worked very closely with the city and guided us smoothly through the <br />complex project when it changed direction. RFIs and submittal reviews where handled in <br />a timely manner, your team was very responsive and always made themselves available <br />to address the City's needs. <br />The cooperation and collaboration that WA brought to the project was greatly <br />appreciated. The result was a successful project that has met the demands of multiple <br />users and everyone involved. Thank you for your hard work. <br />'S ii�fncerely,, n <br />1 ` <br />Q <br />v <br />Rudy de la orre <br />Chief of Construction <br />305 -593 -6725 <br />mdy.delatorre@cityofdoml.com <br />8401 Nwd.w t 53rd Teas« • Doral, Florida 33166 • (305) 5936725 <br />w. w.cinofdoral.mm <br />ARCHITECTURE <br />ENGINEERING <br />PL4NNING <br />INTERIOR DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.