My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AUM CONSTRUCTION, INC.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-11-01) Street Lighting Preventatitve Maintenance As-Needed Electrical Services
>
RESPONSES
>
AUM CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 12:25:10 PM
Creation date
12/8/2023 12:23:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 4: Approach / Methodology <br />AUM has a long history in Street Lighting Maintenance. For over the <br />past 5 years AUM maintained over 13,000 streetlights along both <br />County and FDOT roadways. In addition, AUM was the contractor that <br />installed the + 130 streetlights in Golden Shores. In our scope of work <br />for Group 1, we will conduct nightly patrolling of the 304 lights that will <br />allow us to identify any non -operational lights which will be <br />subsequently repaired the following day. A proactive approach will <br />allow us to exceed the contract's 90% operational goal. During daytime <br />operations AUM will strictly commit to the City's proposed daily work <br />schedule hours to allow the residents to maintain easy access to their <br />homes. <br />We have assigned our most experienced Project Manager along with <br />our senior lighting crew led by one of our three Master Electricians. We <br />have identified a crew to perform the required work for Group 1 as <br />evidenced by our staffing organizational chart shown in Section 3 of this <br />submittal. However, when work orders are issued to undertake Group 2 <br />scope of work, AUM will provide different crews as required for the <br />approved scope of work that specialize in their areas of work, i.e., <br />underground, pre -cast foundation and pull box installations, pole <br />installation, wiring and final restoration. This multiple crew approach <br />allows AUM to expedite the work order completion. <br />AUM takes Safety as our number one priority for our clients, the public <br />and our employees. We will submit a project specific Safety Plan before <br />work commences. <br />Finally, AUM will be ready to mobilize immediately after issuance of a <br />Notice to Proceed from the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.