My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Green Facility ITB 24-01-01
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-01-01) Carpet & Floor Maintenance Services
>
RESPONSES
>
Green Facility ITB 24-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2024 11:45:02 AM
Creation date
2/2/2024 11:44:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Polishing with equipment side to side with defender grip pad, apply salt to the marble floors to <br />enhance and maintain the shine. <br />Using marble polisher or crystallization process. <br /> <br />Stain removal: <br />-Treat stains using appropriate marble cleaning solutions to prevent damage to the polished <br />surface. <br /> <br />Sealing: <br />-Application of a marble sealer to protect against stains and moisture. <br /> <br />Floor inspection: <br />-Periodic inspection of Marble floors for signs of wear, damage or problems that require attention, <br />any damage or problem should be notified to the City of Sunny Isles Beach. <br /> <br />WOOD LAMINATE FLOOR: <br /> <br />Cleaning procedures: <br />-Scope of work includes, but is not limited to sweeping, mopping, spot cleaning, and <br />ensuring general cleanliness and maintenance of floorsurfaces. <br /> <br />Polishing <br />-Once a year strip out the wax coat and reapply 5 to 6 coats of was coats (as needed). <br /> <br />3.6 LOST & FOUND <br /> <br />It is the responsibility of the Contractor to ensure all articles of personal or monetary value found <br />by employee are immediately turned in to the manager of each facility or the Contract <br />Administrator. <br /> <br />3.7 INSPECTIONS <br /> <br />The City representative, shall make inspections at times deemed appropriate to assure timely <br />performance in strict compliance with all specification requirements in all areas being serviced. A <br />check list shall be used for each floor and is to be filled out and approved each week. Include a <br />sample of the checklist with bid submittal. Any work not done to the satisfaction of the City shall <br />be corrected within 24 hours, at the Bidder’s sole expense. <br /> <br />3.8 CONTRACTOR QUALITY CONTROL PROGRAM <br />The Contractor shall have a total quality control program to ensure the requirements of the <br />Contract are met as specified. A Quality Control Plan (QCP) shall be submitted for review and <br />approval within ten (10) days of Contract award. The QCP shall be a system for identifying and <br />correcting deficiencies in the quality of services before the level of performance becomes <br />unacceptable and/or City staff points out the deficiencies. Deductions will be taken for <br />deficiencies. The QCP shall include an inspection system which is tailored to the specific facility <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.