Laserfiche WebLink
South Miami Heights Phase A <br />Miami, Florida <br />ROLE Ric-Man International served as the prime contractor <br />DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />Project consisted of design, construction, and construction management associated <br />with the work related to earthwork, pavement reconstruction, sidewalk construction, <br />water main improvements, fire hydrant Installation, water meters relocated from rear to <br />front of home, landscaping and streetscape/planting improvements. <br />OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />Miami Dade Water and Sewer Department <br />Alex Valdes <br />(786) 299-9008 <br />Alexis.valdes@miamidade.gov <br />3071 SW 38th Ave <br />Miami, FL 33146 <br />GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres Diaz- DB Manager <br />Michael Jankowski - Project Manager <br />Luis Hernandez - Superintendent <br />CONSTRUCTION COST <br />FINAL COST <br />COMPLETION DATE <br />$15.5 million <br />$15.6 million <br />2018 <br />CONSTRUCTION DETAILS <br />SCOPE OF WORK WATER MAIN <br />Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />Yes <br />No <br />1275 <br />50 <br />New Water Main <br />Rear Easement Services <br />Water Meters Connected <br />Fire Hydrants <br />72,000 LF of 8-16" DIP <br />823 <br />744 <br />100 <br />STREETSCAPE STORMWATER DRAINAGE <br />Large Trees <br />Sidewalks & Driveways <br />Curb & Gutter <br />Decorative Pavers <br />Yes <br />Yes <br />Yes <br />Yes <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />0 <br />0 <br />0 <br />0 <br />ROADWAY SANITARY SEWER <br />Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway Reconstruction <br />Yes <br />Yes <br />Yes <br />Yes <br />Sanitary Manholes <br />Sanitary Sewer Main <br />Sewer Lining <br />Sewer Pump Stations <br />0 <br />0 <br />0 <br />0