Laserfiche WebLink
SR 823/NW 57 AVE FROM W. 65TH ST TO W. <br />84TH ST. <br />Hialeah/Opa Loca, Florida <br />ROLE Ric-Man International served as the prime contractor <br />DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />Upgrade SR 823 Red Road by <br />adding 1 NB and 1 SB travel <br />lane, raised medians, <br />landscaping, intersection access <br />management, lighting <br />signalization, new 54” water <br />main and intersection <br />improvements at W 84 th Street <br />OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />FDOT/Central Florida <br />Nelson Cespedes <br />786-552-8142 <br />ncesp@miamidade.gov <br />3071 SW 38th Ave <br />Miami, FL 33136 <br />GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres G. Diaz- General Manager <br />Michael Jankowski - Project Manager <br />Luis Hernandez - Superintendent <br />CONSTRUCTION COST <br />FINAL COST <br />COMPLETION DATE <br />$20,865,766.28 <br />$20,865,766.28 <br />2017 <br />CONSTRUCTION DETAILS <br />SCOPE OF WORK WATER MAIN <br />Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />No <br />No <br />No <br />Yes <br />New Water Main <br />Rear Easement Services <br />Water Meters Connected <br />Fire Hydrants <br />2600 LF of 54" <br />0 <br />1 <br />6 <br />STREETSCAPE STORMWATER DRAINAGE <br />Large Trees <br />Sidewalks & Driveways <br />Curb & Gutter <br />Decorative Pavers <br />Yes <br />Yes <br />Yes <br />Yes <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />13 <br />3 <br />1600 LF of 18" to 42"RCP <br />0 <br />ROADWAY SANITARY <br />Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway Reconstruction <br />Yes <br />Yes <br />No <br />Yes <br />Sanitary Manholes <br />Force Main <br />Sewer Lining <br />Sewer Pump Stations <br />0 <br />800 LF of 16 Inch <br />0 <br />0