Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />Sunset Islands 3 & 4 <br />Miami Beach, Florida <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the prime contractor <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />Project consisted of design, construction, and construction management <br />associated with raising theroad elevation, earthwork, pavement reconstruction, <br />overhead utility undergrounding, sidewalk construction, water main <br />improvements, storm drainage infrastructure installation, sewer main and <br />structure lining, new conduits, conductors and service point for the existing <br />street lights and streetscape/planting improvements. <br /> <br /> <br /> OWNER <br /> <br />CLIENT <br /> <br />PHONE <br />EMAIL <br />ADDRESS <br />City of Miami Beach <br />Capital Improvement Projects Office <br />(CIP) <br />Mina Samadi, Senior Capital Project <br />Coordinator <br />(305) 673-7071 <br />Minasamadi@miamibeachfl.gov <br />1700 Convention Center Drive <br />Miami Beach, FL 33139 <br /> <br /> <br /> GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres Diaz- General Manager <br />Paul Jankowski - Project Manager <br />Luis Hernandez - Superintendent <br /> <br /> <br /> CONSTRUCTION COST <br />COMPLETION DATE <br />$11.1 million <br />2016 <br /> <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK WATER MAIN <br /> Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />Yes <br />6500 LF <br />350 <br />0 <br />New Water Main <br />Rear Easement Services <br />Water Meters <br />Connected <br />Fire Hydrants <br />7270 lf of 8" DIP <br />0 <br />350 <br /> <br /> <br /> <br /> STREETSCAPE STORMWATER DRAINAGE <br /> Large Trees <br />Sidewalks & Driveways <br />Curb & Gutter <br />Decorative Pavers <br />10 <br />2,800 SY <br />16,000 lf <br />No <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />0 <br />115 <br />6895 lf of 18"-30" A2000 <br />2 <br /> <br /> <br /> ROADWAY SANITARY SEWER <br /> Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway <br />Reconstruction <br />20,000 SY <br />No <br />No <br />No <br />Sanitary Manholes <br />Sanitary Sewer Main <br />Sewer Lining <br />Sewer Pump Stations <br />0 <br />0 <br />6,700 lf <br />0 <br /> <br /> <br /> <br /> <br /> <br />(46,354 GPM/ 35,660 GPM) <br />(Design-Build Project)