Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />SR 826 SECTION 5 PROJECT 48-INCH PCCP-NW 2ND AVE <br />Miami, Florida <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the Sub <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />Project consisted of 48" PCCP including restrained pipe, fittings, closures and connections <br />to existing 48" PCCP. The path of the pipe was on NW 72nd Ave a 6-lane road with extreme <br />heavy traffic. Several businesses existed along the path requiring difficult coordination and <br />access at all times. The worked involved; critical demolition of existing PCCP, removing <br />sewage from existing pipe, sheeting and shoring, extensive de-watering, deep excavations, <br />installation of access manholes and air releases, dealing with heavy traffic, working on <br />weekends, nights and multiple crews. Difficult utility support and crossings. The project had <br />tight time restraints due to existing lines requiring minimal shut down period. We <br />succeeded in completing the Installation and connection within the scheduled time frame. <br /> <br /> <br /> OWNER <br />CLIENT <br />PHONE <br />EMAIL <br /> <br />ADDRESS <br />DOT/Miami Dade Water & Sewer <br />Larry Goodwin/Pedro Vigil <br />(786)295-3754 (305)205-5152 <br />goodwin@miamidade.gov/vigilp@miamidade <br />.gov <br />4900 LeJeune Rd <br />Coral Gables, FL <br /> <br /> <br /> <br /> GENERAL CONTRACTOR Ric-Man International, Inc. <br />Andres Diaz- Project Manager <br />Luis Hernandez – Superintendent <br />Michael Jankowski- Asst. Super. <br /> <br /> <br /> CONSTRUCTION COST <br />COMPLETION DATE <br />$521,573.48 <br />2015 <br /> <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK WATER MAIN <br /> Design-Build Project <br />FPL Undergrounding <br />Residences <br />Businesses <br />No <br />No <br />No <br />Yes <br />New Water Main <br />Rear Easement Services <br />Water Meters Connected <br />Fire Hydrants <br />0 <br />0 <br />0 <br />0 <br /> <br /> <br /> STREETSCAPE STORMWATER DRAINAGE <br /> Trees <br />Sidewalks <br />Driveways <br />Curb & Gutter <br />Decorative Pavers <br />No <br />No <br />No <br />No <br />Manholes <br />Catch Basins <br />Drainage Mains <br />Pump Stations <br />0 <br />0 <br />0 <br />0 <br /> <br /> <br /> ROADWAY SANITARY SEWER <br /> Milling & Resurfacing <br />Swale Reconstruction <br />Signalization <br />Roadway Reconstruction <br />Yes <br />No <br />No <br />Yes <br />Sanitary Manholes <br />Gravity Sewer <br />Sanitary Force Main <br /> <br />Sewer Lining <br />Sewer Pump Stations <br /> <br /> <br />150 LF of 48” PCCP, 40 LF of <br />48” DIP <br />0 <br />0 <br /> <br /> <br />