My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ric-Man International, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(23-10-01) Re-Bid Joint Procurement with NMB Central Island Drainage Improvements
>
RESPONSES
>
Ric-Man International, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2024 12:48:51 PM
Creation date
2/20/2024 12:40:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />Surfside Utility Upgrade Project <br />Miami Dade County <br /> <br /> <br /> <br /> ROLE Ric-Man International served as the prime contractor <br /> <br /> DESCRIPTION OF THE <br />SCOPE OF THE WORK <br />The project consisted of water, drainage and sewer Infrastructure improvements to the Town, as <br />well as the restoring 167,000 square yards of road, 33,000 square yards of swale , 1,800 square <br />yards of sidewalk and driveways, and 34,600 feet of curb & gutter. Water construction included <br />replacing a 31,500-foot water main consisting of 4-to 8-Inch DIP and PVC pipe with 950 services; as <br />well as relocating the existing water meters of over 1,600 homes from their rear easements to the <br />front of the homes- work which required daily coordination between RMI and town representatives <br />& residents. Drainage construction consisted of installing 5,500 feet of 10-to 36-Inch DIP and RCP <br />pipe, 47 structures, 9 wells, and 3 pump stations. Sewer construction consisted of rehabi litating a <br />49,500-foot sewer system consisting of 8- to 15-inch CIP pipe, over 2,000 laterals, 166 structures, <br />and 2 pump stations; as well as point-repairing 5,800 feet of the existing sewer main and installing <br />2,500 feet of new 12-inch PVC force main. <br /> <br /> <br /> OWNER <br />CLIENT <br />PHONE <br />EMAIL <br />ADDRESS <br />Town of Surfside <br />Randy Stokes <br />(786) 459-5131 <br />Rstokes@townofsurfsidefl.gov <br />9293 Harding Avenue <br />Surfside, FL 33154 <br /> <br /> <br /> GENERAL CONTRACTOR Ric-Man International, Inc. <br />Rene Castillo, Sr.- Project Manager <br />Luis Hernandez, General Superintendent <br />Paul R. Jankowski- Assistant Project Manager <br />Michael Jankowski- Assistant Superintendent <br /> <br /> <br /> CONSTRUCTION COST $18.3 million <br /> COMPLETION DATE July 2013 <br /> <br /> CONSTRUCTION DETAILS <br /> <br /> SCOPE OF WORK WATER MAIN <br /> Design Build <br />FPL Undergrounding <br />Residences <br />Businesses <br />No <br />23,300 LF <br />1,600 <br />65 <br />Water Main <br />Rear Easement Services <br />Water Services <br />Fire Hydrants <br />31,500 LF (4-8" PVC) <br />355 HDD; 700 Open Cut <br />632 single, 323 double <br />46 <br /> <br /> <br /> ROADWAY <br /> Milling & Resurfacing <br />Swale Reconstruction <br />Roadway Reconstruction <br />Signalization <br /> <br />Streetscape <br />Curb & Gutter <br />Decorative Pavers <br />Sidewalks & Driveways <br />Large Trees <br />167,000 SY <br />18,333 SY <br />6,750 SY <br />yes <br /> <br /> <br />34,600 LF <br />320 SY <br />1,500 SY <br />25 <br /> <br /> <br />Storm Drainage <br />Structures <br />Drainage Mains <br />Pump Stations <br />Disposal Wells <br />Control Structure <br /> <br />Sanitary Sewer <br />Manholes <br />Sewer Main <br /> <br />Pump Stations <br /> <br />41 <br />5,500 LF (10"-36" DIP/RCP) <br />3 <br />9 <br />6 <br /> <br /> <br />166 (Rehab of Existing) <br />5,800 LF Repair 2,500 LF, New <br />46,600 LF <br />2(Rehab. of Existing) <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.