ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL <br />1 Mobilization and Demobilization 1 LS <br />2 General Conditions 1 LS <br />3 Bonding 1 LS <br />4 Overhead and Profit 1 LS <br />5 Maintenance of Traffic 1 LS <br />6 Survey Stakeout 1 LS <br />7 As-builts 1 LS <br />8 Density Testing 1 LS <br />9 Environmental Compliance (NPDES, SWPPP, Dewatering)1 LS <br />10 Desilt completed system pipes - post construction 1 LS <br />11 Desilt completed system structures - post construction 1 LS <br />$ <br />12 Removal & Disposal of Existing 24" or Smaller Storm Pipe 4,228 LF <br />13 Plug Existing 24" or Smaller Storm Pipe 14 EA <br />14 Removal/Disposal of Existing Drainage Structure 40 EA <br />15 No Parking Striping w/two No Parking Signs adjacent to North Pump Station 1 LS <br />16 1 inch Milling 17,500 SY <br />17 1 inch of Asphalt Overlay (SP-9.5)28,000 SY <br />$ <br />18 Type 7 Manhole w/48" Round Bottom & USF 580 43 EA <br />19 Type 7 Manhole w/48" x 48" Rect Bottom & USF 580 7 EA <br />20 Type 7 Manhole w/60" Round Bottom & USF 580 10 EA <br />21 Type 7 Manhole w/60" x 60" Rect Bottom & USF 580 2 EA <br />22 Type 7 Manhole w/72" Round Bottom & USF 580 1 EA <br />23 Type 7 Manhole w/144' Round Bottom w/48" Riser w/USF 580 1 EA <br />24 Type 7 Manhole w/72" Round Bottom w/48"Riser w/USF 580 1 EA <br />25 Type 7 Manhole w/72" x 72" Rect. Bottom & USF 580 w/48" Riser 2 EA <br />26 9' x 6' Manhole Control Structure W/USF 580 (2) & Concrete Weir (SWBX)1 EA <br />27 11' x 11' Manhole Control Structure W/USF 580 (2) & Concrete Weir (NWBX)1 EA <br />28 Type 7 Manhole w/72" x 48" Rect. Bottom & USF 580 3 EA <br />29 P-9 Curb Inlet 1 EA <br />30 P-6 Inlet w/48" Round Bottom 7 EA <br />31 Replace curb inlet w/New P-5 Inlet Top 3 EA <br />32 P-4 Inlet w/48" Round Bottom 1 EA <br />33 8' Diameter Downstream Defender 2 EA <br />34 60" Conflict Structure w/USF 580 for WM w/SS Split Casing 1 EA <br />35 60" Conflict Structure w/USF 580 for Sewer w/SS Split Casing 1 EA <br />36 6'x'4' Conflict Structure w/USF 580 for Sewer w/SS Split Casing 1 EA <br />$ <br />1. BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING <br />LUMP SUM AND/OR UNIT PRICES. <br />2. BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES. <br />3. BIDDER IS TO INCLUDE FULL RESTORATION COSTS INTO THEIR UNIT PRICES EXCEPT FOR THE FINAL ASPHALT OVERLAY <br />THE LUMP SUM (LS) PRICES FOR ITEMS SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS. COSTS <br />FOR PRE-CONSTRUCTION SURVEY ARE TO BE INCORPORATED INTO ITEM 1 AS WELL AS PROJECT SIGN(S). <br />THE LUMP SUM (LS) PRICE FOR (PHASED) CLEARING & STRIPPING SHALL INCLUDE BUT NOT BE LIMITED TO REMOVAL AND PROPER DISPOSAL OF EXISTING GROUND COVERINGS, ASPHALT PAVEMENT OF <br />VARYING DEPTH, SIDEWALKS, CURB & GUTTER, CONCRETE PAVEMENT, LIMEROCK AND SUBGRADE (WHERE APPLICABLE), TREES AND/OR ALL OTHER ORGANIC MATERIAL FROM RIGHT OF WAY TO RIGHT OF <br />WAY AS NECESSARY TO PERFORM THE WORK STIPULATED IN THESE CONTRACT DOCUMENTS. THE LUMP SUM PRICE SHALL ALSO INCLUDE BUT NOT BE LIMITED TO REMOVAL, PROTECTION, STORAGE AND <br />REINSTALLATION OF BUS SHELTERS, EXISTING SIGNS, DECORATIVE STONE, LANDSCAPING, AND SPRINKLER SYSTEMS EXISTING WITHIN THE WORK ZONE. ALL ITEMS SHALL BE RESTORED TO AS EXISTING (SUCH AS <br />EXISTING PAVERS) OR BETTER CONDITION AND AS PER PLANS. <br />ROADWORK ITEMS <br />STORMWATER STRUCTURES ITEMS <br />STORMWATER PIPES ITEMS <br />GENERAL ITEMS SUB-TOAL (1 - 11) <br />ROADWORK ITEMS SUB-TOAL (12 - 17) <br />STORMWATER STRUCTURES ITEMS SUB-TOTAL (18-36) <br />THE PRICE FOR EACH ROAD WORK ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br />CONTRACT DOCUMENTS. <br />THE PRICE FOR EACH DRAINAGE STRUCTURE CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN <br />ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE APPLICABLE, DE-WATERING & NPDES <br />PERMITS, INCLUDING THE REQUIRED CONSTRUCTION BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE DURATION OF THE PROJECT, <br />BEDDING MATERIAL, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME ELEVATION AS EXISTING ASPHALT <br />PAVEMENT (GRADE TO SLOPE) GRADING, TESTING, INSPECTIONS AND ANY OTHER MISCELLANEOUS WORK. <br />GENERAL ITEMS <br />INVITATION TO BID NO. 23-10-01 <br />JOINT PROCUREMEMT <br />ADDENDUM # 5 REVISED BID PRICE <br />SHEET 1/5/2024