Laserfiche WebLink
ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL <br />1. BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING <br />LUMP SUM AND/OR UNIT PRICES. <br />2. BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES. <br />3. BIDDER IS TO INCLUDE FULL RESTORATION COSTS INTO THEIR UNIT PRICES EXCEPT FOR THE FINAL ASPHALT OVERLAY <br /> <br />INVITATION TO BID NO. 23-10-01 <br />JOINT PROCUREMEMT <br />37 18" A2000 PVC 69 LF <br />38 24" A2000 PVC 6488 LF <br />39 30" A2000 PVC 1306 LF <br />40 36" A2000 PVC 1364 LF <br />41 48" RCP 275 LF <br />42 72" RCP 6 LF <br />43 96" RCP 6 LF <br />44 8' x 6' Concrete Box Culvert 8 LF <br />$STORMWATER PIPES ITEMS SUB-TOTAL (37 - 44) <br />THE PRICE FOR EACH DRAINAGE PIPE CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN <br />ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE POSSIBLE, DE-WATERING & NPDES <br />PERMITS, INCLUDING THE REQUIRED CONSTRUCTION BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE DURATION OF THE PROJECT, <br />BEDDING MATERIAL, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME ELEVATION AS EXISTING ASPHALT <br />PAVEMENT (GRADE TO SLOPE) GRADING, TESTING, INSPECTIONS AND ANY OTHER MISCELLANEOUS WORK.