Laserfiche WebLink
ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL <br />1. BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING <br />LUMP SUM AND/OR UNIT PRICES. <br />2. BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES. <br />3. BIDDER IS TO INCLUDE FULL RESTORATION COSTS INTO THEIR UNIT PRICES EXCEPT FOR THE FINAL ASPHALT OVERLAY <br /> <br />INVITATION TO BID NO. 23-10-01 <br />JOINT PROCUREMEMT <br />45 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 18" Pipe 69 LF <br />46 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 24" Pipe 6488 LF <br />47 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 30" Pipe 1306 LF <br />48 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 36" Pipe 1364 LF <br />49 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 48" Pipe 275 LF <br />50 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 72" Pipe 6 LF <br />51 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 96" Pipe or 8' x 6' Box Culvert 14 LF <br />$ <br />52 30" DIP FM 552 LF <br />53 42" DIP FM 80 LF <br />54 42" x 30" DIP Reducer 2 EA <br />55 30" - 45 Deg DIP Bend 10 EA <br />56 30" x 30" DIP Tee 1 EA <br />57 30" x 30" DIP "True" Wye 1 EA <br />58 30" x 18" Reducer 4 EA <br />59 18" DIP 56 LF <br />60 18" Resilient Wedge Flanged Gate Valve 4 EA <br />61 18" Swing Type Lever & Weight Flanged Check Valve 4 EA <br />62 18" - 45 Deg DIP Bend 4 EA <br />$ <br />63 <br />Duplex Stormwater Pumping Station (16' L x 16' W x 15' H) <br />2 EA <br />64 <br />Duplex Stormwater Pumping Station piping, fittings, valves, & Electrical Components not otherwise mentioned in <br />previous 2 EA <br />65 Vault for Duplex Stormwater Pumping Station (8' L x 16' W x 6.8' H)2 EA <br />66 Vault piping, fittings & valves not otherwise mentioned in previous quantities (DIP FM)2 EA <br />67 Pump Station electrical components 2 EA <br />68 Portable Diesel 125 KW Generator 2 EA <br />69 Provide 3-Phase Power at Each Station Allowance 2 EA $105,000 $210,000 <br />70 SCADA SYSTEM 2 EA <br />THE LUMP SUM PRICE OF THIS ITEM SHALL INCLUDE FULL RESTORATION AS PER PLAN. THE FURNISHING OF ALL MATERIAL, EQUIPMENT, AND LABOR NECESSARY TO COMPLETELY INSTALL TWO (2) <br />STORMWATER PUMPING STATIONS (INCLUDING ALL PIPING, PUMPS, VALVE VAULTS, STRUCTURES, CONTROL PANELS, POWER HOOKUP, INCLUDING ALL NECESSARY INSTALLATION PROCEDURES AS <br />DETERMINED BY THE CONTRACTOR AND FROM THE FOLLOWING ITEMS AND ACTIVITIES: SHEET PILING, COFFER DAMS, DEWATERING AND DEWATERING PERMITS, FORMS, PROTECTION OF EXCAVATION <br />AT ALL TIMES, SPECIFIC TRAFFIC CONTROL AND SPECIFIC NOTICES TO ADJACENT PROPERTY OWNERS REGARDING CLOSURES (IF APPLICABLE) AND INCONVENIENCES. FURNISH ALL MATERIALS, EQUIPMENT AND <br />LABOR NECESSARY TO INSTALL ALL STORMWATER PUMP STATION ELECTRICAL, COORDINATION WITH FPL FOR NEW SERVICE DROP, POWER VERIFICATION, AND INSTRUMENTATION WORK. INCLUDING, <br />BUT NOT LIMITED TO: PUMP CONTROL PANEL, STARTERS, CABINETS, SCADA-PLC, CONDUITS, WIRE CABLES, PULL BOXES, POWER RECEPTACLES, SWITCHES, BREAKERS, REINFORCED CONCRETE <br />EQUIPMENT PAD, AND ALL NECESSARY ELECTRICAL CIRCUITS. STRUCTURAL ELEMENTS OR ACTIVITIES SHALL BE PERFORMED USING THE SERVICES OF A FLORIDA REGISTERED PROFESSIONAL <br />ENGINEER TO DEVELOP, CERTIFY, SIGN AND SEAL PLANS FOR THE PUMP STATION STRUCTURES AND SPECIFICALLY FOR ACTIVITIES SUCH AS: FORM PLACEMENT AND REMOVAL OF STEEL SIZE AND <br />PLACEMENT, POURING METHODS FOR THE SPECIFIC MASS OF CONCRETE, CONCRETE CURING, AND PROTECTION METHODS. INCLUDE ALL COST FOR SURVEYING AND AS-BUILT PREPARATION, <br />BEDDING MATERIAL, BACKFILL AND TEMPORARY ASPHALT RESTORATION, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, HANDICAP RAMP, BACKFILL LIMEROCK BASE MATERIAL COMPACTION <br />LABORATORY TEST, PERMANENT TRENCH RESTORATION , MATERIAL TO BE RESTORED TO PROPOSED ELEVATIONS (GRADE TO SLOPE), TESTING, INSPECTION AND OTHER MISCELLANEOUS WORK. <br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS <br />FORCE MAIN ITEMS <br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS SUB-TOAL (45 - 51) <br />FORCE MAIN ITEMS SUB-TOAL (52 - 62) <br />THE PRICE FOR EACH SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br />CONTRACT DOCUMENTS TO COVER OVEREXCAVATION WITH DISPOSAL OF UNSUITABLE MATERIAL WITH THE ADDITION OF NEW FILL. <br />WITH THE EXCEPTION OF THE FINAL ASPHALT OVERLAY, THE PRICE FOR EACH CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL <br />AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE <br />POSSIBLE, DE-WATERING & NPDES PERMITS, INCLUDING THE REQUIRED CONSTRUCTION BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE <br />DURATION OF THE PROJECT, BEDDING MATERIAL, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME <br />ELEVATION AS EXISTING ASPHALT PAVEMENT (GRADE TO SLOPE) GRADING, TESTING, INSPECTIONS AND ANY OTHER MISCELLANEOUS WORK. <br />PUMP STATION ITEMS