Laserfiche WebLink
<br /> <br /> <br /> <br />LUIS HERNANDEZ <br />GENERAL <br />SUPERINTENDENT <br />EXPERIENCE <br />Mr. Hernandez has over 29 years of <br />experience in South Florida working for <br />municipalities from Monroe County <br />through Palm Beach County. He has <br />successfully completed seven <br />neighborhood improvement projects from <br />21,000 to 105,000 feet of water mains and <br />sanitary sewers. Luis is also familiar with <br />directional drilling, micro tunnel, pump <br />stations, and aerial crossings. Mr. <br />Hernandez is one of Ric‐Man <br />International’s most esteemed employees <br />for his commitment to excellence and <br />willingness to do what’s necessary to <br />perform his duties and please our clients. <br />He has shown great zeal in handling several <br />crews and projects simultaneously while <br />maintaining the highest standards <br /> <br />CERTIFICATIONS <br />• Occupational Safety & Health <br />Association – 10 Hour Training <br />• Occupational Safety & Health <br />Association – Competent Person <br />Excavation & Trench as well as <br />Permit Required Confined Space <br />• OSHA 3015- Excavation, <br />Trenching & Soil Mechanics <br />• First Aid/CPR Certified <br />PROJECT EXPERIENCE <br />Project: 60-INCH Force Main (NL-1A) (West Segment) Along NW <br />162ND Street From NW 6th Ave to N.E. 8th Ave <br />Owner: Miami Dade Water & Sewer- $19,314,785.95 <br />Role: General Superintendent <br />The scope of work includes, but is not limited to, the furnishing and <br />installation of approximately 10,000 linear feet of 60- inch <br />PCCP with T-Lock lining, including the corresponding fittings and <br />valves; connection to existing 72-inch PCCP slip-lined with 63” <br />HDPE force main at intersection of NW 159th Street and NW 6th <br />Avenue and connection to a proposed 60-inch PCCP force main <br />(being constructed by others under Contract No. S-944) at NE 161st <br />St and NE 8th Ave and leaving a stub out for future <br />connection at NW 162nd Street and NW 2nd Avenue; furnishing and <br />installing Automatic Air Release Valves; furnishing and <br />installing required 60-inch Flanged Plug valves; valve access <br />manholes; access manholes; temporary pavement installation and <br />removal; pavement restoration, surface and sodding restoration; tree <br />relocations; pavement markings restoration; MOT and public <br />outreach coordination <br /> <br />Project: 60-Inch Force Main (NL-1A) Between the Intersections of <br />NE 151 St & Biscayne Blvd and NE 163 ST & NE 8 Ave <br />Owner: Miami Dade Water & Sewer- $25,527,995.49 <br />Role: General Superintendent <br />The scope of work includes, but is not limited to, the furnishing and <br />installation of approximately 12,500 linear feet of 60-inch PCCP, <br />including the corresponding fittings and valves; microtunnel <br />installation at NE 151st Street and Biscayne Boulevard including <br />two (2) 30-feet deep shafts, and approximately 600 linear feet of 84- <br />inch steel casing and 60-inch PCCP; approximately 200 linear feet of <br />84-inch steel casing and 60-inch PCCP at FEC Right-of-Way; <br />furnishing and installing one (1) 72-inch by 60-inch tapping saddle <br />and one (1) 60-inch tapping valve required to make a tapping <br />connection to an existing 72-inch force main at NE 151 Street east <br />of Biscayne Boulevard; furnishing and installing six (6) Air Release <br />Valves and fifteen (15) Automatic Air Release Valves; furnishing and <br />installing six (6) 60-inch Flanged Plug valves; relocation of <br />approximately 1,400 linear feet of 12-inch ductile iron water main <br />including one(1) fire hydrant assembly; furnishing and installing <br />approximately 270 linear feet of 16-inch force main; furnishing and <br />installation of 28 access manholes; furnishing and installation of <br />approximately 50 feet of 18-inch HDPE storm drainage pipe, <br />approximately 50 feet of exfiltration trench and 2 storm inlets <br /> <br />DB Services of 36- inch Diameter Sanitary Sewer FM Along NW 107th <br />Ave <br />Owner: Miami Dade Water & Sewer- $8,954,735.95 <br />Role: General Superintendent <br />The project consists of replacing the existing 24-inch force main on <br />NW 107 Ave from south of NW 7 street to NW 25 street with a new <br />36-inch force main into the existing force main system in order to