Laserfiche WebLink
<br /> <br />As well as fire hydrant assemblies, approximately <br />664 dual water services and approximately 40 <br />single water services with approximately 1,368 <br />water service conversions from rear to front. <br /> <br />Utility analysis Zone 113B <br />Owner: Broward County WWSS – $28,115,925.52 <br />Role: Asphalt Superintendent <br />The project consisted of the furnishing of all labor, <br />materials, equipment, services and incidentals for <br />the construction of the infrastructure site work. <br />The work will include site preparation, earthwork, <br />sanitary sewer system installation (38,100 LF of 8- <br />18” PVC), water systems installation (59,820 LF of <br />DIP 6-16”) (940 LF of 6-12” HDD) (440 services), <br />roadway and walkway restoration and <br />construction, landscape restoration, restoring <br />existing irrigation systems, pavement marking <br />restoration and site furnishings <br /> <br /> <br /> <br /> <br />D/B South Miami Heights Ph B <br />Owner: Miami Dade Water and Sewer - <br />$15,732,076.54 <br />Reference: Alexis Valdez 786-299-9008 <br />Role: Asphalt Superintendent <br />Installation of over 30,000 LF of new 8” watermain <br />and fire hydrants via Pipe Bursting Installation of <br />700+ new water service meters <br />Construction of over 80,000 SY of drainage swales <br />and new landscaping Installation of 5,000 LF of <br />new 10” force-main including an intercoastal <br />waterway crossing Partial roadway reconstruction <br />of failing existing roadway 75,000 SY of existing <br />roadway milling and resurfacing New sidewalk <br />and driveway apron construction throughout the <br />neighborhood <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Springtree WWTP On-Site & Off-Site Drainage & <br />Utilities Improvements <br />Owner: City of Sunrise - $2.8 million <br />Reference: Tim Welch 954-888-6055 <br />Role: Asphalt Superintendent <br />Installation of over 1,500 LF of Drainage pipe and <br />structures up to 42” in Diameter. Installation of <br />2,500 LF of new 8” watermain and hydrants. <br />Installation of 1,000 LF of new Reclaim water force- <br />main ranging from 6” to 16” in Dia. Full pavement <br />and roadway reconstruction. Lake expansion and <br />outfall installation. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />