Laserfiche WebLink
28 Type 7 Manhole w/72" x 48" Rect. Bottom & USF 580 3 EA 26,000.00 78,000.00 <br />29 P-9 Curb Inlet 1 EA 23,000.00 23,000.00 <br />30 P-6 Inlet w/48" Round Bottom 7 EA 26,000.00 182,000.00 <br />31 Replace curb inlet w/New P-5 Inlet Top 3 EA 10,500.00 31,500.00 <br />32 P-4 Inlet w/48" Round Bottom 1 EA 22,500.00 22,500.00 <br />33 8' Diameter Downstream Defender 2 EA 280,000.00 560,000.00 <br />34 60" Conflict Structure w/USF 580 for WM w/SS Split Casing 1 EA 39,000.00 39,000.00 <br />35 60" Conflict Structure w/USF 580 for Sewer w/SS Split Casing 1 EA 39,000.00 39,000.00 <br />36 6'x'4' Conflict Structure w/USF 580 for Sewer w/SS Split Casing 1 EA 40,500.00 40,500.00 <br /> 3,023,000.00 <br />37 18" A2000 PVC 69 LF 1,191.00 82,179.00 <br />38 24" A2000 PVC 6488 LF 902.00 5,852,176.00 <br />39 30" A2000 PVC 1306 LF 887.00 1,158,422.00 <br />40 36" A2000 PVC 1364 LF 1,102.00 1,503,128.00 <br />41 48" RCP 275 LF 1,250.00 343,750.00 <br />42 72" RCP 6 LF 2,200.00 13,200.00 <br />43 96" RCP 6 LF 3,500.00 21,000.00 <br />44 8' x 6' Concrete Box Culvert 8 LF 3,800.00 30,400.00 <br /> 9,004,255.00 <br />ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL <br />45 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 18" Pipe 69 LF 400.00 27,600.00 <br />46 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 24" Pipe 6488 LF 290.00 1,881,520.00 <br />47 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 30" Pipe 1306 LF 295.00 385,270.00 <br />48 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 36" Pipe 1364 LF 305.00 416,020.00 <br />49 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 48" Pipe 275 LF 385.00 105,875.00 <br />50 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 72" Pipe 6 LF 400.00 2,400.00 <br />51 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 96" Pipe or 8' x 6' Box Culvert 14 LF 755.00 10,570.00 <br /> 2,829,255.00 <br />52 30" DIP FM 552 LF 1,450.00 800,400.00 <br />53 42" DIP FM 80 LF 2,730.00 218,400.00 <br />54 42" x 30" DIP Reducer 2 EA 68,000.00 136,000.00 <br />55 30" - 45 Deg DIP Bend 10 EA 29,500.00 295,000.00 <br />56 30" x 30" DIP Tee 1 EA 49,000.00 49,000.00 <br />57 30" x 30" DIP "True" Wye 1 EA 233,000.00 233,000.00 <br />58 30" x 18" Reducer 4 EA 34,000.00 136,000.00 <br />59 18" DIP 56 LF 840.00 47,040.00 <br />60 18" Resilient Wedge Flanged Gate Valve 4 EA 69,000.00 276,000.00 <br />61 18" Swing Type Lever & Weight Flanged Check Valve 4 EA 48,000.00 192,000.00 <br />62 18" - 45 Deg DIP Bend 4 EA 7,200.00 28,800.00 <br /> 2,411,640.00 <br />WITH THE EXCEPTION OF THE FINAL ASPHALT OVERLAY, THE PRICE FOR EACH CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE <br />ITEMS IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE POSSIBLE, DE-WATERING & NPDES PERMITS, INCLUDING <br />THE REQUIRED CONSTRUCTION BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE DURATION OF THE PROJECT, BEDDING MATERIAL, BACKFILL BASE MATERIAL, <br />SODDING, CURBING, SIDEWALK, BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME ELEVATION AS EXISTING ASPHALT PAVEMENT (GRADE TO SLOPE) GRADING, TESTING, INSPECTIONS AND ANY <br />OTHER MISCELLANEOUS WORK. <br />FORCE MAIN ITEMS SUB-TOAL (52 - 62) <br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS <br />THE PRICE FOR EACH SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br />CONTRACT DOCUMENTS TO COVER OVEREXCAVATION WITH DISPOSAL OF UNSUITABLE MATERIAL WITH THE ADDITION OF NEW FILL. <br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS SUB-TOAL (45 - 51) <br />FORCE MAIN ITEMS <br />2. BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES. <br />3. BIDDER IS TO INCLUDE FULL RESTORATION COSTS INTO THEIR UNIT PRICES EXCEPT FOR THE FINAL ASPHALT OVERLAY <br />STORMWATER PIPES ITEMS <br />THE PRICE FOR EACH DRAINAGE PIPE CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br />CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE POSSIBLE, DE-WATERING & NPDES PERMITS, INCLUDING THE REQUIRED CONSTRUCTION <br />BEST MANAGEMENT PRACTICES TO MAINTAIN TURBIDITY WITHIN THE REQUIRED NPDES STANDARDS DURING THE DURATION OF THE PROJECT, BEDDING MATERIAL, BACKFILL BASE MATERIAL, SODDING, CURBING, SIDEWALK, <br />BACKFILL LIMEROCK BASE MATERIAL, COMPACTION, MATERIAL TO BE RESTORED TO SAME ELEVATION AS EXISTING ASPHALT PAVEMENT (GRADE TO SLOPE) GRADING, TESTING, INSPECTIONS AND ANY OTHER MISCELLANEOUS WORK. <br />STORMWATER PIPES ITEMS SUB-TOTAL (37 - 44) <br />1. BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING <br />LUMP SUM AND/OR UNIT PRICES. Formula = Qty x Unit cost = Total <br />STORMWATER STRUCTURES ITEMS SUB-TOTAL (18-36)