92 SS Lateral Relocation 1 EA 18,000.00 18,000.00 <br />93 Rental of 2 temporary 6000 gpm pumps to provide backup for storm protection 12 MTHS 96,000.00 1,152,000.00 <br />94 Hourly Crew Rate 100 HR 2,000.00 200,000.00 <br />95 City Permit fee 1 EA 10,000.00 10,000.00 <br /> 3,335,730.00 <br /> 39,673,144.00 <br />96 1 inch Milling 5,100 SY 4.00 20,400.00 <br />97 1 inch of Asphalt Overlay (SP-9.5)5,100 SY 16.00 81,600.00 <br /> 102,000.00 <br />98 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 4" Pipe 20 LF 230.00 4,600.00 <br />99 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 6" Pipe 700 LF 250.00 175,000.00 <br />100 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 8" Pipe 3800 LF 245.00 931,000.00 <br />101 Up to 3ft of Overexcavation & Disposal of Unsuitable Material with new fill for 12" Pipe 10 LF 245.00 2,450.00 <br /> 1,113,050.00 <br />102 WATER SERVICE CONNECTION (4" DIP) (PER FIG 216)44 EA 14,500.00 638,000.00 <br />103 FIRE SERVICE CONNECTION (6" DIP) (PER FIG 216) (NOT SHOWN ON PLANS)44 EA 14,500.00 638,000.00 <br />104 8" STEEL PIPE (INCLUDES ALL BENDS, FITTINGS, STRAPS, AND ANY OTHER EQUIPMENT OR MATERIAL)350 LF 2,400.00 840,000.00 <br />105 4" DIP (INCLUDES ALL BENDS AND FITTINGS)20 LF 490.00 9,800.00 <br />106 6" DIP (INCLUDES ALL BENDS AND FITTINGS)700 LF 800.00 560,000.00 <br />ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL <br />107 8" DIP (INCLUDES ALL BENDS AND FITTINGS)11400 LF 680.00 7,752,000.00 <br />108 12" DIP (INCLUDES ALL BENDS AND FITTINGS)10 EA 2,900.00 29,000.00 <br />109 AIR RELEASE VALVE 5 EA 26,000.00 130,000.00 <br />110 6" GATE VALVE 30 EA 6,200.00 186,000.00 <br />111 8" GATE VALVE 17 EA 8,000.00 136,000.00 <br />112 FIRE HYDRANT ASSEMBLY (PER FIG 307)30 EA 19,000.00 570,000.00 <br />113 CUT-IN CONNECTION TO EXISTING WATERMAIN 3 EA 24,000.00 72,000.00 <br />114 REMOVAL OF EXISTING HYDRANTS 30 EA 6,000.00 180,000.00 <br />115 REMOVAL OF EXISTING ASBESTOS CEMENT PIPE 810 LF 290.00 234,900.00 <br />116 CAP AND GROUT FILL WATERMAINS ABANDONDED WATERMAINS 6" AND LARGER 80 BCY 2,000.00 160,000.00 <br />117 8" REINFORCE SLAB (PER FIG 209) FOR USE WITH WATERMAINS WITH LESS THAN 2.5' COVER 2400 SQF 35.00 84,000.00 <br />118 GEOTEXTILE FABRIC (TENSAR TX5)15000 SY 10.00 150,000.00 <br />119 6" LINE STOP 12 EA 27,000.00 324,000.00 <br />120 8" LINE STOP 12 EA 29,000.00 348,000.00 <br />121 12" LINE STOP 12 EA 32,000.00 384,000.00 <br />122 SAMPLE POINTS 20 EA 9,600.00 192,000.00 <br />TOTAL FOR STORM DRAINAGE PROJECT $ <br />3. BIDDER IS TO INCLUDE FULL RESTORATION COSTS INTO THEIR UNIT PRICES EXCEPT FOR THE FINAL ASPHALT OVERLAY <br />WATERMAIN ITEMS <br />WITH THE EXCEPTION OF THE FINAL ASPHALT OVERLAY, THE PRICE FOR EACH CONSTRUCTION ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL <br />AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS WHICH INCLUDE ALL SAW CUTTING, ASPHALT REMOVAL AND DISPOSAL, EXCAVATION, DE-WATERING WHERE <br />1. BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING <br />LUMP SUM AND/OR UNIT PRICES. Formula = Qty x Unit cost = Total <br />2. BIDS SHALL INCLUDE SALES TAX AND ALL OTHER APPLICABLE TAXES AND FEES. <br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS <br />THE PRICE FOR EACH SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br />CONTRACT DOCUMENTS TO COVER OVEREXCAVATION WITH DISPOSAL OF UNSUITABLE MATERIAL WITH THE ADDITION OF NEW FILL. <br />OVEREXCAVATION, DISPOSAL, NEW FILL ITEMS SUB-TOAL (98 - 101) <br />WATERMAIN REPLACEMENT PROJECT <br />ROADWORK ITEMS <br />THE PRICE FOR EACH ROAD WORK ITEM SHALL INCLUDE BUT NOT BE LIMITED TO ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY TO INSTALL AND CONSTRUCT THESE ITEMS IN ACCORDANCE WITH THESE <br />CONTRACT DOCUMENTS. BID PRICE INCLUDES TRAFFIC LOOP REPLACEMENT, IF NEED (INCLUDES ALL PROFESSIONAL WORK AND PERMITTING). <br />ROADWORK ITEMS SUB-TOAL (96 - 97) <br />MISCELLANEOUS ITEMS SUB-TOAL (71 - 95)