Laserfiche WebLink
SOUTHEASTERN <br />SURFACES & EQUIPMENT <br />Florida State Certified M1WBE <br />Florida State Certified General Contractor— CGC 012423 <br />QUOTATION <br />TO: CITY OF SUNNY ISLES BEACH <br />Attn <br />PROJECT: PELICAN PARK <br />Gymnasium Floor Replacement <br />We are pleased to quote as follows: <br />Robbins Sports Surfaces, Sourcewell Contract # 060518 -RBI <br />DATE: 2/16/2024 <br />RECOMMENDED SYSTEM. <br />• Item #5 Eclipse SB — 8,208 sq. ft. <br />o List price $22.69 per sq. ft. discounted to $19.73 per sq. ft. $161,943.84 <br />• Item #49 Demolition and disposal of existing system — 8,208 sq. ft. <br />o Priced per project, $1.50 per sq. ft. $ 12,312.00 <br />Total, per Sourcewell Contract $174,255.84 <br />Additional discount from SSE — 5% ( 8,712.79) <br />Total Adjusted Contract pricing $165,543.05 <br />Pricing for handling bleachers not included in Sourcewell contract. Add $3,500 for SSE to handle <br />bleachers during demo and reinstallation of existing flooring. <br />No graphics/logo included in proposal. This can be added based on artwork selected. <br />220V / 3 Phase power must be available in close proximity to gymnasium. If appropriate power is not <br />available, please add $2,250 for generator rental. <br />Sanding machines come equipped with dust collection devices, however fine sanding dust will be <br />present after installation. No additional cleaning of gymnasium furnishings or HVAC protection <br />included in proposal. <br />4---i) P.O. Box 602 • 569 Canal Street • New Smyrna Beach • Florida • 32170 <br />._ Phone: (386) 428-8875 • Fax: (386) 428-8767 <br />www.sseteam.com <br />